Assisted Living Manager AZ
Numbers Questions With Verified
Answers
Save
Practice questions for this set
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
Terms in this set (114)
,A rural General 50 or fewer inpatient beds located
Hospital defined not more than 20 surface miles from
as a general hospital
How close can 1/4 mile
agricultural land
be located to
healthcare
institution?
Project cost for $50
health care
institution
remodel
$100,000 or less,
how much
would
architectural
drawing fee be?
Licensing fees $280, plus the licensed capacity
for an assisted times $70
living home with
bed capacity of
1 to 59 beds
,Licensing fee $560, plus license capacity times
with bed $70
capacity, 60-99
beds?
Submitting a At least 60 days, but not more than
license 120 days before expiration of
application current license
packet to DHS
timeline?
How long is One year
DHS renewed
license good
for?
Overall 105 days
timeframe for
approval of
architectural
plans and
specifications?
, Overall 120 days
timeframe for
approval of
healthcare
institution initial
license?
Overall 90 days
timeframe for
approval of
healthcare
institution
renewal license?
License 180 days or six months
application,
withdrawn after
how many days
if follow up
documents are
not received?
Numbers Questions With Verified
Answers
Save
Practice questions for this set
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
Terms in this set (114)
,A rural General 50 or fewer inpatient beds located
Hospital defined not more than 20 surface miles from
as a general hospital
How close can 1/4 mile
agricultural land
be located to
healthcare
institution?
Project cost for $50
health care
institution
remodel
$100,000 or less,
how much
would
architectural
drawing fee be?
Licensing fees $280, plus the licensed capacity
for an assisted times $70
living home with
bed capacity of
1 to 59 beds
,Licensing fee $560, plus license capacity times
with bed $70
capacity, 60-99
beds?
Submitting a At least 60 days, but not more than
license 120 days before expiration of
application current license
packet to DHS
timeline?
How long is One year
DHS renewed
license good
for?
Overall 105 days
timeframe for
approval of
architectural
plans and
specifications?
, Overall 120 days
timeframe for
approval of
healthcare
institution initial
license?
Overall 90 days
timeframe for
approval of
healthcare
institution
renewal license?
License 180 days or six months
application,
withdrawn after
how many days
if follow up
documents are
not received?