CWRU EMAE 260 Final Exam
Questions With Verified Answers
Save
Terms in this set (78)
To design is to synthesize
What is
something new or rearrange
engineering
existing things in a new way to
design?
satisfy a need.
, 1. Conceptual Design - narrow
down to a best concept from
several candidates
2. Embodiment Design - strength,
materials selection, size, shape, etc.
3. Detail Design - complete
engineering description of a tested
and producible product
Seven Phases of
4. Planning for Manufacture -
Design
detailed plans for manufacture,
tools, fixtures, work schedules,
inventory controls, quality
assurance, labor costs...
5. Product Distribution
6. Product Use
7. Product Retirement or
Decommissioning
Multi-step
Document success and failures
Why is design
Communicate, analyze, test
an iterative
process?
Customer requirement change
New information arises.
, A project is temporary, every
project has an end date.
A project is an endeavor;
Name 3 resources, such as people and
characteristic of equipment need to do work.
a project Projects create a unique product or
service; the deliverable for the
project and the reason that the
project was undertaken.
Customer Requirements
satisfied/exceeded
What is a Completed within allocated time
successful frame
project? Completed within allocated
budget
Acceptance by the customer
•Scope creep
•Poor requirements gathering
•No Functional input in planning
Why do •Lack of sponsorship
projects fail? •Unrealistic planning and
scheduling/Impossible schedule
commitments
•Lack of resources
, The Project Time, Cost, and Scope
Triangle
-Take responsibility for the success
of the team
-Deliver on commitments
-Be a contributor to discussions
A Good Team -Give your full attention to
Member speakers and ask questions
-Develop techniques for getting
your message across to the team
-Learn to give and receive useful
feedback
The team sponsor is the manager
who has the need for the output of
the team.
The team leader convenes and
Team Sponsor
chairs the team meetings using
vs. Team Leader
effective meeting management
vs. Team
practices.
Facilitator
The team facilitator is a person
trained in group dynamics who
assists the leader and the team in
achieving its objectives.
Questions With Verified Answers
Save
Terms in this set (78)
To design is to synthesize
What is
something new or rearrange
engineering
existing things in a new way to
design?
satisfy a need.
, 1. Conceptual Design - narrow
down to a best concept from
several candidates
2. Embodiment Design - strength,
materials selection, size, shape, etc.
3. Detail Design - complete
engineering description of a tested
and producible product
Seven Phases of
4. Planning for Manufacture -
Design
detailed plans for manufacture,
tools, fixtures, work schedules,
inventory controls, quality
assurance, labor costs...
5. Product Distribution
6. Product Use
7. Product Retirement or
Decommissioning
Multi-step
Document success and failures
Why is design
Communicate, analyze, test
an iterative
process?
Customer requirement change
New information arises.
, A project is temporary, every
project has an end date.
A project is an endeavor;
Name 3 resources, such as people and
characteristic of equipment need to do work.
a project Projects create a unique product or
service; the deliverable for the
project and the reason that the
project was undertaken.
Customer Requirements
satisfied/exceeded
What is a Completed within allocated time
successful frame
project? Completed within allocated
budget
Acceptance by the customer
•Scope creep
•Poor requirements gathering
•No Functional input in planning
Why do •Lack of sponsorship
projects fail? •Unrealistic planning and
scheduling/Impossible schedule
commitments
•Lack of resources
, The Project Time, Cost, and Scope
Triangle
-Take responsibility for the success
of the team
-Deliver on commitments
-Be a contributor to discussions
A Good Team -Give your full attention to
Member speakers and ask questions
-Develop techniques for getting
your message across to the team
-Learn to give and receive useful
feedback
The team sponsor is the manager
who has the need for the output of
the team.
The team leader convenes and
Team Sponsor
chairs the team meetings using
vs. Team Leader
effective meeting management
vs. Team
practices.
Facilitator
The team facilitator is a person
trained in group dynamics who
assists the leader and the team in
achieving its objectives.