ANSWERS
FBRs must be screened & forwarded by 3MC within how many days of origination in SKED? -
ANS 7 days
What is used to confirm the # of spot checks? - ANS Spot Check Matrix
What are the two types of FBRs? - ANS 1. Category A (Non-Technical)
2. Category B (Technical)
What are the two types of Category B Technical FBRs? - ANS 1. Routine
2. Urgent
Which type of FBR is used to change Workcenter LOEP? - ANS Category A Non-Technical
Once the 3MC signs off on an FBR, what is attached to the FBR before sending the FBR off ship?
- ANS Serial #
What does the lack of a serial # on an FBR indicate? - ANS The 3MC has not signed off on the
FBR
What type of FBR is submitted that involves safety of personnel, the ship, or potential damage
to equipment? - ANS Category B - Urgent
1 Copyright ©BRIGHSTARS ALL RIGHTS RESERVED 2025
, Once generated in SKED, Urgent FBRs are forwarded via what method? - ANS Naval Message
What program is used to report maintenance actions and configuration changes? -
ANS OMMS - NG
What is a Job Control Number (JCN) comprised of? - ANS 1. UIC
2. 4 digit Workcenter Code
3. 4 digit sequential job #
What is a Job Sequence Number (JSN) comprised of? - ANS 1. 4 digit Workcenter Code
2. 4 digit sequential job #
Technical Review Activities are required to answer all TFBRs within how many days? - ANS 21
What must be included when generating an Urgent FBR in SKED? - ANS DTG of message
What type of FBR is used to report technical discrepancies and clarification of procedures in
PMS documentation? - ANS CAT B Routine
What type of FBR is submitted to request classified or other PMS documentation which cannot
be obtained locally? - ANS CAT A Non-Technical
Technical Review Activities will provide a preliminary response for Urgent FBRs within how
many days? - ANS 1 working day
On what day do Force Revsions (FR) take effect (implemented)? - ANS First Monday of the
Quarter
2 Copyright ©BRIGHSTARS ALL RIGHTS RESERVED 2025