Exam Questions with 100% Correct
Answers | Latest Update
Which of the following factors influence the recycling efforts within buildings?
A) Lack of education
B) Non-availability of recycling programs in town
C) ignorance about recycling
D) lack of convenient, physical spaces for recycling - 🧠 ANSWER ✔✔D) lack of
convenient, physical spaces for recycling
A project team for a school project will reuse the shell of an existing building and
recycle the rest of the construction and demolition debris. Which of the following
MR credits will this have a positive affect? (choose 2)
,A) MR Credit Building Life-Cycle impact reduction
B) MR Credit Furniture and Medical Furnishings
C) MR Prerequisite Storage and Collection of Recyclables
D) MR Credit Construction and Demolition Waste Management - 🧠 ANSWER
✔✔A) MR Credit Building Life Cycle Impact Reduction
D) MR Credit Construction and Demolition Waste Management
A project has limited storage area for waste containers. What would you
recommend for this project to earn MR credit construction waste management? - 🧠
ANSWER ✔✔commingle collection recycling
a facility is considering mercury-free alternatives to low wattage fluorescent lamps
such as LEDs in order to meet Prerequisite PBT source reduction - Mercury. What
is true for the project to use this strategy? - 🧠 ANSWER ✔✔mercury free
alternatives should be at least as energy efficient as comparable mercury
containing lamps
a project is pursuing MR credit building life-cycle impact reduction using Option
3: Building and Material Resue. What will determine the number of points the
, 3
projects can earn using this option? - 🧠 ANSWER ✔✔percentage of completed
project surface area reused
A project is pursuing MR Credit Building Product Disclosure and Optimization -
Environmental Product Declarations using Option 2. What should the project team
do in order to qualify for exemplary performance? - 🧠 ANSWER ✔✔Purchase
75% (by cost) of permanently installed building products that meet the required
attributes
what must be true for the scope of EPDs to adhere with MR credit Building
Product Disclosure and Optimization - EPD requirements? - 🧠 ANSWER ✔✔the
scope of any EPD must be at least cradle-to-gate
Which of the following is true for a healthcare project, pursuing MR Credit
Medical Furniture and Furnishings and MR Credit Building Product Disclosure
and Optimization? - 🧠 ANSWER ✔✔freestanding furniture items included in MR
Credit Medical Furniture and Furnishings cannot be counted in any Building
Product Disclosure and Optimization credits
A project pursuing MR Credit Building Product Disclosure and Optimization -
Sourcing of Raw Materials is using Option 1: Raw Material Source and Extraction
Reporting to comply with credit requirements. The project identified 3 products
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED