100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

API 653 RECERTIFICATION EXAM –ACTUAL EXAM-LATEST UPDATE 2025-COMPLETE QUESTIONS WITH CORRECT DETAILED AND VERIFIED ANSWERS | RATED 100% CORRECT!! GUARANTEED PASS!! ALREADY GRADED A+

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
29-07-2025
Written in
2024/2025

API 653 RECERTIFICATION EXAM –ACTUAL EXAM-LATEST UPDATE 2025-COMPLETE QUESTIONS WITH CORRECT DETAILED AND VERIFIED ANSWERS | RATED 100% CORRECT!! GUARANTEED PASS!! ALREADY GRADED A+

Institution
API 653 RECERTIFICATION
Course
API 653 RECERTIFICATION









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
API 653 RECERTIFICATION
Course
API 653 RECERTIFICATION

Document information

Uploaded on
July 29, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

API 653 RECERTIFICATION EXAM –ACTUAL EXAM-LATEST UPDATE 2025-
COMPLETE QUESTIONS WITH CORRECT DETAILED AND VERIFIED ANSWERS |
RATED 100% CORRECT!! GUARANTEED PASS!! ALREADY GRADED A+

Per API 653 , with of the following is required when converting an existing tank to operation at
elevated temperatures when it was not originally designed and constructed to API 650, Appendix
M? - (answers)The Shell to bottom joint shall be evaluated for fatigue


When removing an existing tank bottom, all arc-gouged areas of the tank shell-to-bottom shall
be: - (answers)examined using magnetic particle inspection, and defective areas repaired and re-
examined.


If RBI assessment has been conducted and the tank has cathodic protection plus a thin-film
lining, the maximum inspection interval is: - (answers)14 years


When installing a new nozzle in a tank of unknow material, what stress value should be used to
calculate the required shell thickness and reinforcement? - (answers)20,000 lbf/in2


In regards to underside corrosion on tank bottoms, the corrosion rate of steel in a wet
environment. - (answers)may double with every 18 °F increase in temperature above 77 °F.


Grade 350W/50W is acceptable for tank plate to a maximum thickness of: - (answers)45mm
(1.75in) if fully killed and made to a fine grain practice.


If an RBI assessment has been conducted and the tank has a release prevention barrier, the
maximum initial inspection interval is: - (answers)25 years


As an alternative to the procedures in API 653 for the evaluation of any thinning of the tank shell
below minimum required wall thickness may be evaluated for continued service using which
code? - (answers)API RP 579, section 4, 5 or 6.


When welding on a tank shell constructed of Group I steel that is greater than 1.5 inches thick
below what minimum metal temperature ?preheat? - (answers)200°F

, When evaluated an existing temperature services tank, which has a successful service history of
operation but was not originally designed and constructed to the requirement of API 650,
appendix M, which condition temperature has to be used? - (answers)The max Operating
Temperature shall not exceed the temperature at which the tank has successfully operated in the
pass.


Flange material used for tank repair and alteration shall meet the minimum requirements for the
material specifications according to: - (answers)The as built standard


which is an advantage of thick film UN-REINFORCED linings ? - (answers)Fast curing and can
be put back in service after 24 hours at normal ambient temperature.


The perimeter welds on a welded-on patch plate in the critical zone should be ? - (answers)Two-
pass and examined visually and by either MP or PT.


Existent welds on a tank shell are found to e closer than allowed by API 650 (7th Edition). Under
what conditions can these welds be considered to be acceptable for continued service? -
(answers)Examined by MP inspection with no rejectable indications.


The requirements of which standard shall be considered in the evaluation and alteration to the
tank roof and roof-to-shell junction ? - (answers)Current applicable standard


Welding procedure for ladder and platform assemblies, but not their attachment to the tank? -
(answers)Shall comply with either AWS D1.1, AWS D1.6 or ASME Code Section IX.


In floating roof tanks, shell nozzles without internal piping within operating range of the floating
roof shall be supplied? - (answers)Flush on the inside of the tank.


The attachment welds of new lap-welded shell patch plates shall be examined by: -
(answers)Visually and by either MP or PT

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SmarttDocs Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
117
Member since
10 months
Number of followers
4
Documents
1244
Last sold
2 days ago
SMARTDOCS

Welcome to Smartdocs– your go-to source for high-quality study guides, question banks, and exam-focused materials for every subject and level. Whether you're cramming for a last-minute test or aiming for top marks, our clear, accurate, and easy-to-use documents are designed to help you succeed faster. Trusted by students, built for results – level up your learning today!

4.9

35 reviews

5
32
4
2
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions