FDOT Asphalt Paving Level 2 Exam 2026
Questions and Answers
What makes up a quality asphalt mixture? - Answer -A quality asphalt mixture is
determined by the constructability, if it conforms to Specifications, and if it
satisfies functional requirements.
CQC - Answer -contractor quality control
Superpave - Answer -Asphalt mix design system since 1998
QCP - Answer -Quality control plan
QCM - Answer -Quality control Manual
QC - Answer -Quality Control (Contracting Testing and Inspection)
VT - Answer -Verification Testing (FDOT or CEI Verification)
CEI - Answer -Construction Engineering and Inspection
RT - Answer -Resolution Testing (FDOT)
IV - Answer -Independent Verification Testing
IA - Answer -Independent Assurance Testing
©COPYRIGHT 2025, ALL RIGHTS RESERVED 1
, The decision-making authority on a job needs to be given to who? - Answer -
Needs to be given to the level closet to the work as specified in the specifications.
It ensure a quick handle on situations and issues.
The governing order of project documents from high (1) to low (7) starts with the
highest being - Answer -Special Provisions
The governing order of project documents from high to low (2) - Answer -
Technical Special Provisions
The governing order of project documents from high to low (3) - Answer -Plans
The governing order of project documents from high to low (4) - Answer -Road
design, structures, and traffic operations standards
The governing order of project documents from high to low (5) - Answer -
Developmental Specifications
The governing order of project documents from high to low (6) - Answer -
Supplemental Specifications
The governing order of project documents from high to low (7) - Answer -Standard
Specifications
What are the key components in a pre-paving conferences? - Answer -Key
Personnel (Paving superintendent)
©COPYRIGHT 2025, ALL RIGHTS RESERVED 2
Questions and Answers
What makes up a quality asphalt mixture? - Answer -A quality asphalt mixture is
determined by the constructability, if it conforms to Specifications, and if it
satisfies functional requirements.
CQC - Answer -contractor quality control
Superpave - Answer -Asphalt mix design system since 1998
QCP - Answer -Quality control plan
QCM - Answer -Quality control Manual
QC - Answer -Quality Control (Contracting Testing and Inspection)
VT - Answer -Verification Testing (FDOT or CEI Verification)
CEI - Answer -Construction Engineering and Inspection
RT - Answer -Resolution Testing (FDOT)
IV - Answer -Independent Verification Testing
IA - Answer -Independent Assurance Testing
©COPYRIGHT 2025, ALL RIGHTS RESERVED 1
, The decision-making authority on a job needs to be given to who? - Answer -
Needs to be given to the level closet to the work as specified in the specifications.
It ensure a quick handle on situations and issues.
The governing order of project documents from high (1) to low (7) starts with the
highest being - Answer -Special Provisions
The governing order of project documents from high to low (2) - Answer -
Technical Special Provisions
The governing order of project documents from high to low (3) - Answer -Plans
The governing order of project documents from high to low (4) - Answer -Road
design, structures, and traffic operations standards
The governing order of project documents from high to low (5) - Answer -
Developmental Specifications
The governing order of project documents from high to low (6) - Answer -
Supplemental Specifications
The governing order of project documents from high to low (7) - Answer -Standard
Specifications
What are the key components in a pre-paving conferences? - Answer -Key
Personnel (Paving superintendent)