Disregarding aaexceptions, aaall aaof aathe aafollowing aaare aaconsidered aaindividual
aawater aasupplies aaexcept aa_______________ aa. aa- aaAns>>>Land aacisterns
What aais aathe aamaximum aadistance aaa aapan aadrain aacan aaterminate aaabove aathe
aaadjacent aaground aasurface? aa- aaAns>>>24"
What aais aathe aaminimum aaflow aapressure aaof aaa aatemperature-controlled aashower?
aa- aaAns>>>20 aapsi
Water aaservice aapipe aaand aathe aabuilding aasewer aaare aarequired aato aabe aaseparated
aaby aaa aaminimum aaof aa_____________ aafeet. aa- aaAns>>>5 aaft
The aaoverflow aafor aaa aawater aasupply aatank aashall aabe aacovered aaby aaa aacorrosion-
resistant aascreen aaof aanot aaless aathan aa_________________ aamesh aaper aainch. aa-
aaAns>>>16x20
Hospital aafixtures aashall aabe aaprotected aaagainst aabackflow aawith aaall aaof aathe
aafollowing aaexcept: aa- aaAns>>>Dual-check aavalve
When aatankless aawater aaheaters aaare aaintended aafor aadomestic aause, aathe
aatemperature aaof aathe aawater aashall aanot aaexceed aa_______________ aadegrees. aa-
aaAns>>>140
Water aaheaters aaoperating aaabove aathe aaatmospheric aapressure aashall aabe
aaprovided aawith aa______________. aa- aaAns>>>A aalevered aapressure aarelief aavalve
aaand aatemperature aavalve aaor aacombination aathereof
Pumps aainstalled aain aabasements aashall aabe aamounted aaon aablock aanot aaless aathan
aa_____________ aainches aaabove aathe aafloor. aa- aaAns>>>18
Joints aaused aabetween aacopper aaand aagalvanized aasteel aapipes aashall aabe aamade
aawith aa(a) aa_________________. aa- aaAns>>>Dielectric aafitting
Correct Solutions.
Disregarding aaexceptions, aaall aaof aathe aafollowing aaare aaconsidered aaindividual
aawater aasupplies aaexcept aa_______________ aa. aa- aaAns>>>Land aacisterns
What aais aathe aamaximum aadistance aaa aapan aadrain aacan aaterminate aaabove aathe
aaadjacent aaground aasurface? aa- aaAns>>>24"
What aais aathe aaminimum aaflow aapressure aaof aaa aatemperature-controlled aashower?
aa- aaAns>>>20 aapsi
Water aaservice aapipe aaand aathe aabuilding aasewer aaare aarequired aato aabe aaseparated
aaby aaa aaminimum aaof aa_____________ aafeet. aa- aaAns>>>5 aaft
The aaoverflow aafor aaa aawater aasupply aatank aashall aabe aacovered aaby aaa aacorrosion-
resistant aascreen aaof aanot aaless aathan aa_________________ aamesh aaper aainch. aa-
aaAns>>>16x20
Hospital aafixtures aashall aabe aaprotected aaagainst aabackflow aawith aaall aaof aathe
aafollowing aaexcept: aa- aaAns>>>Dual-check aavalve
When aatankless aawater aaheaters aaare aaintended aafor aadomestic aause, aathe
aatemperature aaof aathe aawater aashall aanot aaexceed aa_______________ aadegrees. aa-
aaAns>>>140
Water aaheaters aaoperating aaabove aathe aaatmospheric aapressure aashall aabe
aaprovided aawith aa______________. aa- aaAns>>>A aalevered aapressure aarelief aavalve
aaand aatemperature aavalve aaor aacombination aathereof
Pumps aainstalled aain aabasements aashall aabe aamounted aaon aablock aanot aaless aathan
aa_____________ aainches aaabove aathe aafloor. aa- aaAns>>>18
Joints aaused aabetween aacopper aaand aagalvanized aasteel aapipes aashall aabe aamade
aawith aa(a) aa_________________. aa- aaAns>>>Dielectric aafitting