Operation and Maintenance of Wastewater Collection System Volume I

Institution
Operation And Maintenance Of Wastewater Collection
Course
Operation and Maintenance of Wastewater Collection









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Operation and Maintenance of Wastewater Collection
Course
Operation and Maintenance of Wastewater Collection

Document information

Uploaded on
July 18, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Operation and Maintenance of
Wastewater Collection System Volume
I




Lift station. What is the most important requirement of a lift station? - CORRECT
ANSWER-1. Economics .
2. Operation and maintenance.
3. Reliability.
4. Safety.

Why should the design of a lift station take into consideration any humid atmosphere in
the station? - CORRECT ANSWER-1. To avoid making operators sweat profusely.
2. To keep moisture from hindering light passing through the window.
3. To minimize corrosion damage.
4. To prevent the need to remove water condensation from the humidity.

What is a major favorable feature of a dry well pump station? - CORRECT ANSWER-1.
Allows operators easy access to remove debris.
2. Minimize cost of construction due to simplicity.
3. Provides a cleaner and safer environment for operation and maintenance personnel.
4. Requires only one well for wastewater and equipment

Why are there provisions in some lift stations for wet well aeration during low-flow
period? - CORRECT ANSWER-1. To enhance performance of anoxic selectors.
2. To help keep detained wastewater fresh.
3. To increase hydrogen sulfide production.
4. To maintain corrosion processes.

What happens if a wet well is too large? - CORRECT ANSWER-1. Cavitation will be a
problem.

, 2. Pumps will operate too frequently.
3. Solids will tend to accumulate on the bottom.
4. Wet well maintenance will be minimized.

A ground-fault circuit interrupter (GFCI) is designed to limit electric shock to a current
and time duration value below what level? - CORRECT ANSWER-1. That which can
cause ignition of clothing.
2. That which can create minor pain sensations.
3. That which can pass through your body.
4. That which can produce serious injury.

How are programmable logic controllers (PLCs) usually programmed? - CORRECT
ANSWER-1. Using a laptop computer.
2. Using formatted computer language codes.
3. Using software simulation codes.
4. Using textbook logic.

What happens when a seal fails on a submersible pump? - CORRECT ANSWER-1.
Wastewater back flows into potable water supply and contaminates the water.
2. Wastewater leaks into the dry well and cause electrical outages.
3. Wastewater overflows the seal and causes adverse environmental impacts.
4. Wastewater penetrates the motor compartment and burns or shorts out the motor.

Why should large horizontal pumps have a vent valve on top of the volute? - CORRECT
ANSWER-1. For priming purposes.
2. For purpose of preventing water
hammer.
3. To prevent for formation of vacuum.
4. To release entrained air.

What is the main purpose of gate valves in a lift station? - CORRECT ANSWER-1. To
check the pump efficiency on the pump curve.
2. To function as a check valve when the check valves fail.
3. To isolate the pump from the force main during pump or check valve maintenance.
4. To throttle pumped flows to avoid overloading the sewer system.

What is the main purpose of a check valve? - CORRECT ANSWER-1. To prevent
damage from pump cavitation.
2. To prevent operators from checking on pump maintenance.
3. To prevent the force main from draining back into the wet well.
4. To prevent the pump from pumping excess flows.

Why should operations and maintenance operators be given the opportunity to review
the prints and specifications of a new lift station before the award of a contract for new
construction? - CORRECT ANSWER-1. To allow operations to learn how to design lift
stations.
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
constantinelyketsos

Also available in package deal

Thumbnail
Package deal
Operation and Maintenance of Wastewater Collection System Volume I
-
6 2025
$ 68.54 More info

Get to know the seller

Seller avatar
constantinelyketsos Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
5 months
Number of followers
9
Documents
1238
Last sold
4 days ago
Nursing study hub

welcome to my store high quality study notes ,summeries ,and guides to hep student understand faster and achieave better grades.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions