100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

WGU C720 Complete OA Prep Guide NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
17-07-2025
Written in
2024/2025

WGU C720 Complete OA Prep Guide NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
C720 PA WGU
Course
C720 PA WGU










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
C720 PA WGU
Course
C720 PA WGU

Document information

Uploaded on
July 17, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • c720 pa wgu

Content preview

WGU C720 Complete OA Prep Guide

Four Types of Demand - ANS-o Peak
o Seasonal
o Unexpected
o Chase

6 Types of Inventory - ANS-o Raw Materials
o Work In Progress
o Finished Goods
o Replacement Parts Inventory
o Supplies
o Transportation

ABC evaluation - ANS-Has been evolved to decide which stock items must receive the very best
stage of manage. By multiplying the greenback value of each object by its annual usage, a
dollar utilization cost can be acquired. Dollar utilization follows the Pareto Principle in that
frequently, simplest 20% of all of the objects account for eighty% of the total greenback
utilization, at the same time as the final gadgets regularly account for only 20% of the greenback
usage. This principle leads to the _____ classification, that is based totally on focusing efforts in
which the payoff is maximum

Actual Output - ANS-Total amount produced in the course of a given time period.

Adjustment - ANS-Adds or reduce potential in small or massive amounts as consumer demand
modifications; brought about by predominant adjustments to process or gadget

Aesthetics - ANS-How a product seems, feels, sounds, tastes, or smells.

Aggregate planning - ANS-Combining of person cease objects into corporations or households
of parts for planning functions.

Agile - ANS-The use of responsiveness, competency, flexibility, and quickness to manipulate
how properly a deliver chain entity operates on a every day basis.

Suitable for modern merchandise like cellular phones and computer systems.

Focus: Speed and versatility.

For products with quick lifespan and unpredictable demand.

,Assembly Line - ANS-Process selection maximum appropriate to supply excessive extent with
little to no version.

Uses product facility layout (i.E. Car manufacture)

Assurance - ANS-Knowledge and courtesy of personnel and their potential to bring accept as
true with and confidence.

Backward Vertical Integration - ANS-When a organization owns the dealer or deliver manner
inside the deliver chain.

Batch Flow - ANS-Process choice maximum appropriate to produce excessive quantity with
some variation.

Uses product facility format: requires device or tool modifications

Benchmarking - ANS-Process by using which a corporation compares its overall performance to
the overall performance of different organizations.

Bill of materials (BOM) - ANS-Lists the materials needed and the portions of every.

Bottleneck - ANS-The maximum proscribing constraint on the machine

Buildup Method - ANS-Starting at the bottom of the business enterprise and running to the
pinnacle to solicit data to decide forecast

Capacity - ANS-A degree of an agency's capacity to sustainably provide customers with the
demanded offerings or items in the amount asked and in a timely way, given contemporary
sources. Capacity additionally describes an agency's most sustainable rate of manufacturing.

Capacity planning - ANS-Needed to assist customer call for and hold manufacturing capacity as
needs for products trade

Capacity Utilization - ANS-A metric, or degree, used to determine how plenty capability is
honestly being used on a mean basis.

Capacity utilization = Actual Output / Design Capacity

Cause-and-impact diagrams or fishbone diagrams or Ishikawa diagrams - ANS-Show the impact
of various inputs into the end result of a procedure. They assist organizations isolate the basis
causes of issues along with bottlenecks in their methods.

Chase Demand - ANS-Demand that occurs when a employer has to alter manufacturing with
the aid of quotes to fit call for with the aid of various the group of workers and using beyond

, regular time. Companies vary the group of workers by adding or decreasing the quantity of
personnel on responsibility at any given time. And they will choose to provide time beyond
regulation through asking people to live on the task past their typically scheduled time.

Check sheets - ANS-The manner used to file data points in actual-time at the site wherein the
records is generated. This is often the first tool used to evaluate a procedure and regularly the
data is "raw" meaning it's miles straight from the source and without any interpretation.

Conformance - ANS-Degree to which a product's layout and working characteristics fit
pre-installed requirements.

Constraint - ANS-Any resource whose ability is much less than or same to call for for that useful
resource

Continuous Flow - ANS-Process selection maximum suitable to supply excessive quantity
without a variant.

Uses product facility format (i.E. Oil refinery). Also known as non-stop stock flow

Control charts - ANS-Graphical depictions of manner output where the raw statistics is plotted in
real-time within top (UCL) and lower manipulate limits (LCL).

Conveyance kanban, or C-kanban - ANS-A digital sign or digital authorization to transport a
container of parts or replenishment of substances. E-kanban also can be used to authorize the
production of elements or subassemblies. This is commonly accomplished with the aid of
scanning barcodes with a cell app or virtual device to alert necessary parties of the materials
wished.

Crosby - ANS-Used the word "Do it proper the primary time."
Wrote a book in 1979 entitled "Quality is Free"
Concept of zero defects as a measurable item Emphasized the importance of thinking about all
expenses of quality

Cycle time - ANS-Measure of how regularly a selected product is made.

Cycle time = working time per day/devices

Deming - ANS-Had a 14-point great plan
Statistical Process Control (SPC)
"System" caused defects, now not employees
Endorsed the removal of worry within the organisation Modified Walter Shewart's
Plan-Do-Check-Act (PDCA) to Plan-Do-Study-Analyze (PDSA)

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ashley96 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
594
Member since
2 year
Number of followers
198
Documents
5052
Last sold
15 hours ago

In my page you will find all latest Exams , with Questions and Answers, package deals, etc. I upload quality. Instant delivery. You will get solutions to all subjects in both assignments and major exams. Contact me for any assistance. Good Luck!!!

4.0

156 reviews

5
88
4
21
3
25
2
6
1
16

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions