100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PRO4801 Assignment 3 (ANSWERS) 2025 - DISTINCTION GUARANTEED

Rating
-
Sold
2
Pages
13
Grade
A+
Uploaded on
13-07-2025
Written in
2024/2025

Well-structured PRO4801 Assignment 3 (ANSWERS) 2025 - DISTINCTION GUARANTEED. (DETAILED ANSWERS - DISTINCTION GUARANTEED!)... Question 3.1 The ABC project faced many challenges, including delays and budgetary constraints. Among the key issues raised has been the specification of the product, which must ensure the customer gets value for money. It is reported that poor planning was the order of the day due to a lack of experience of the hired project manager and a lack of guidelines regarding approaches to take. The organisation was still growing and had to establish a Project Management Office to provide guidance and support. As an expert who completed PRO4801 and with experience gained over the years working on various types of projects, you have been hired as a consultant to provide guidelines on how planning should be undertaken. You’re required to provide confidence to the appointing authority by addressing the questions (3.1, 3.2, 3.3) posed in the different sections. Distinguish between the different steps in the project planning process and explain the purpose of typical questions to be answered in each step. [20] Question 3.2 The appointing authority (above) requires clarity on scheduling to avoid the project’s further delay and, therefore, requires you to attend to the aspects that follow. The scheduling of work elements (work packages) is a crucial aspect in planning since scheduling determines the basis for resource allocation, cost estimates, and project performance. Justify how the project will benefit from using the following: (i) Project master schedule and project activities. (7) (ii) Task schedules, Gantt charts, and milestone schedules. (7) (iii) Network scheduling (6) [20] Question 3.3 The appointing authority (above) also needs an understanding of planning tools that can be utilized in the project. Defend the use of the different planning tools and documents in the project, highlighting the significance of each. (i) Work breakdown structure (WBS) (7) (ii) Statement of Work (SOW) (7) (iii) Responsibility matrix (6) [20] Question 3.4 The Taxi Recapitalisation Project (TRP) was identified, introduced, and developed by the Minister of Transport to assess the effectiveness and efficiency of transforming the taxi industry. The TRP specifies eleven activities that can be accomplished either by one person working alone or by several people working together. The activities, precedence constraints, and time estimates are shown in the following table: Activities Preceding activities Person-days required A - 15 B A 8 C A 5 D B 6 E D 8 F C 7 G E, F 4 H F 2 I F 3 J H, I 3 K J, G 2 NOTES: • You have five people who can be assigned on any given day. • A person must work full days on each activity. • The number of people working on an activity can vary from day to day. REQUIRED: (i) Prepare a network diagram (use the AON format) and calculate the critical path(s), the early start and finish times, the late start and finish times, as well as the total slack of each activity. Assume that only one person is working on each activity. Indicate how many person-days will be needed to complete this project. (20) (ii) Prepare a time chart (Gantt chart) for all the activities. (10) (iii) Use the time chart to prepare a daily personnel assignment sheet to complete the project within the shortest possible time. Also mention how many days the project could be compressed if unlimited personnel resources were available. (7) (iv) Will the company have to pay penalties if activities H and I are both delayed by nine days? How can the slack at activity J be used to overcome this problem? (3) [40]

Show more Read less
Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Course

Document information

Uploaded on
July 13, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PRO4801 Assignment 3 2025
Unique Number:
Due date: August 2025
QUESTION 1

The project planning process is an essential phase that sets the foundation for successful
project execution. As Nicholas and Steyn (2021) explain, this process involves a structured
approach aimed at determining what needs to be done, how it should be done, who should
do it, when it should be done, how much it will cost, and how progress will be monitored. The
purpose of each step in this process is to answer specific questions that reduce uncertainty
and guide the project team. In the case of the ABC project, these steps were not properly
implemented, leading to avoidable challenges. Below is an explanation of the key steps in
the planning process and the critical questions they address.

Step 1: Define the Desired End Result

The first step in planning is to define the project’s objectives, scope, and system
requirements. This step answers the question, “What is the desired end result?” According
to Nicholas and Steyn (2021), this involves clearly identifying what the project must deliver,
such as products, services, or outcomes. The scope defines the boundaries of the project,
including what is included and what is excluded. Properly defining this early on helps to
avoid scope creep and ensures that all stakeholders share a common understanding of what
the project will achieve. System requirements ensure the outputs meet technical standards

DISCLAIMER & TERMS OF USE
 Educational Aid: These study notes are intended to be used as educational resources and should not be seen as a
replacement for individual research, critical analysis, or professional consultation. Students are encouraged to perform
their own research and seek advice from their instructors or academic advisors for specific assignment guidelines.
 Personal Responsibility: While every effort has been made to ensure the accuracy and reliability of the information in
these study notes, the seller does not guarantee the completeness or correctness of all content. The buyer is
responsible for verifying the accuracy of the information and exercising their own judgment when applying it to their
assignments.
 Academic Integrity: It is essential for students to maintain academic integrity and follow their institution's policies
regarding plagiarism, citation, and referencing. These study notes should be used as learning tools and sources of
inspiration. Any direct reproduction of the content without proper citation and acknowledgment may be considered
academic misconduct.
 Limited Liability: The seller shall not be liable for any direct or indirect damages, losses, or consequences arising from
the use of these notes. This includes, but is not limited to, poor academic performance, penalties, or any other negative
consequences resulting from the application or misuse of the information provided.

, For additional support +27 81 278 3372

QUESTION 1

The project planning process is an essential phase that sets the foundation for
successful project execution. As Nicholas and Steyn (2021) explain, this process
involves a structured approach aimed at determining what needs to be done, how it
should be done, who should do it, when it should be done, how much it will cost, and
how progress will be monitored. The purpose of each step in this process is to
answer specific questions that reduce uncertainty and guide the project team. In the
case of the ABC project, these steps were not properly implemented, leading to
avoidable challenges. Below is an explanation of the key steps in the planning
process and the critical questions they address.

Step 1: Define the Desired End Result

The first step in planning is to define the project’s objectives, scope, and system
requirements. This step answers the question, “What is the desired end result?”
According to Nicholas and Steyn (2021), this involves clearly identifying what the
project must deliver, such as products, services, or outcomes. The scope defines the
boundaries of the project, including what is included and what is excluded. Properly
defining this early on helps to avoid scope creep and ensures that all stakeholders
share a common understanding of what the project will achieve. System
requirements ensure the outputs meet technical standards or customer needs.
Without this clarity, the project team risks working towards goals that are misaligned
with stakeholder expectations, which was one of the key issues in the ABC project.

Step 2: Determine How the Result Will Be Achieved

The second step involves identifying the tasks, work activities, and jobs that need to
be completed. It answers the question, “How will the result be achieved?” These
tasks include all efforts necessary to meet the defined objectives, such as technical
development, testing, planning, and coordination. A Work Breakdown Structure
(WBS) is often used to break the project into manageable tasks. This breakdown
assists in resource allocation and helps ensure that no critical activities are
overlooked. Nicholas and Steyn (2021) stress that comprehensive task identification
allows for better coordination and control later in the project. The ABC project failed
at this stage due to poor task planning and a lack of structured methodology.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Edge
Follow You need to be logged in order to follow users or courses
Sold
9676
Member since
2 year
Number of followers
4252
Documents
2651
Last sold
23 hours ago

4.2

1176 reviews

5
663
4
236
3
177
2
27
1
73

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions