NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE that the transmission path is out of service c. Tie Lines - For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency calculations, and all ________ must be metered. a. Communications b. Transformers c. Tie Lines d. Generation c. Energy Emergency Alert Level I - What Energy Alert Level would the following example be categorized as?

Show more Read less
Institution
NERC
Course
NERC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
July 10, 2025
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • verified answers
  • nerc

Content preview

NERC Prep - Bal, Int, & Trans Exam Questions and Answers
b. NERC Operating Committee - What group can approve a change in the
Disturbance Recovery Period for an Interconnection?
a. NERC Interconnection Working Group
b. NERC Operating Committee
c. NERC Regional Council
d. NERC Disturbance Analysis Working Group


c. Check targets and equipment - What is the first thing an operator should do after
a relay operation?
a. Check power system stabilizers
b. Notify adjacent Transmission and Balancing areas
c. Check targets and equipment
d. Notify their PSE that the transmission path is out of service


c. Tie Lines - For the ACE equation to work properly, dynamic schedules,
pseudo ties, frequency calculations, and all must be metered.
a. Communications
b. Transformers
c. Tie Lines
d. Generation


c. Energy Emergency Alert Level I - What Energy Alert Level would the following
example be categorized as?
"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees,
or is experiencing conditions where all available resources are committed to meet
firm load, firm transactions, etc, and requests an Energy Emergency Alert."

,a. Energy Emergency Alert Level IV
b. Energy Emergency Alert Level III
c. Energy Emergency Alert Level I
d. Energy Emergency Alert Level II


b. Implement the appropriate congestion management procedure. - You are a
Reliability Coordinator in the Eastern Interconnection. A flow gate has become
overloaded because a parallel 345kV line has relayed out and part of that load has
transferred over to the flow gate causing an SOL and possible IROL violation.
What would you do to relieve this violation?
a. Notify another Reliability Coordinator and ask them if they are having
any problem, and what should you do.
b. Implement the appropriate congestion management procedure.
c. Issue a Transmission warning to the Transmission Operators that lost the
345kV line.
d. Place the line back in service within 30 minutes.


b. Adjacent Balancing Authorities - Interchange schedules may be
implemented between .
a. Source and Sink Balancing Authorities
b. Adjacent Balancing Authorities
c. Sending, Receiving and Intermediate Balancing Authorities in the same Region.
d. Balancing Authorities in the same Interconnection.


a. Frequency will continue to drop, generator governor response, decrease in load.
- When the frequency of an Interconnection decreases due to the loss of a large
generator, the until the combination of both
and replace the output of the lost generator.

, a. Frequency will continue to drop, generator governor response, decrease in load
b. Frequency will continue to drop, generator governor response,
voltage regulating transformer response
c. Voltage will continue to raise, generator AVR response, voltage regulating
transformer response
d. Voltage will continue to raise, generator AVR response, decrease in load


a. That all involved reliability entities determined that there is no
reliability problems with the Arranged Interchange. - In developing and
setting up an Arranged Interchange, which of the following would
transition the Arranged Interchange to the Confirmed Interchange status?
a. That all involved reliability entities determined that there is no
reliability problems with the Arranged Interchange.
b. The Department of Energy (DOE) made an in-depth study of the
Interchange Agreement and determined that it would have an adverse affect
on the Interconnection.
c. There are available resources to meet the load.
d. All parties involved realized that they would not lose money for their
company with this Interchange Agreement.


b. He violated NERC standards - Early in the afternoon, a system operator
notices that frequency has dropped to 59.95Hz and his balancing area's ACE is
0. In order to correct the under frequency condition, the operator pulses his
generators to increase generation. Which statement best describes his actions?
a. He followed NERC guidelines
b. He violated NERC standards
c. He helped the system
d. He has not impacted the system

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
17dollars Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
144
Member since
1 year
Number of followers
6
Documents
1090
Last sold
2 days ago
prosepalace

Nursing Being my main profession line, My mission is to be your LIGHT in the dark. If you\'re worried or having trouble in nursing school, I really want my notes to be your guide! I know they have helped countless others get through and that\'s all I want for YOU! I have essential guides that are Almost A+ graded, I am a very friendly person:

4.9

194 reviews

5
186
4
2
3
3
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions