Electrical Installation 2365 exam 210 with correct answers
The main contractor involved with a large project is most likely to be a? - correct answerBuilder
What job would a structural engineer carry out? - correct answerDesign load-bearing beams
What is the role of building service engineers? - correct answerTo install and maintain BSE
systems
What is the role of a charge hand? - correct answerTo be in charge if a group of workers
What is the role of the customer? - correct answerTo pay for work to be completed
What frequencies are covered in the IET Wiring Regulations? - correct answer50Hz, 60Hz, 400Hz
If a cable run measured on a drawing with a scale of 1:25 is 65 cm, what is the actual length of
the cable run? - correct answer16.25 m
The right to a fair trial is covered under which of the following Acts? - correct answerHuman
Rights Act
A room of width 2.6m is to be represented on a drawing with a scale of 1:50, what length would
this appear as on the drawing in - correct answer5.2cm
When preparing an estimate the main cost considerations are? - correct answerLabour,
Materials and plant
The main contractor involved with a large project is most likely to be a? - correct answerBuilder
What job would a structural engineer carry out? - correct answerDesign load-bearing beams
What is the role of building service engineers? - correct answerTo install and maintain BSE
systems
What is the role of a charge hand? - correct answerTo be in charge if a group of workers
What is the role of the customer? - correct answerTo pay for work to be completed
What frequencies are covered in the IET Wiring Regulations? - correct answer50Hz, 60Hz, 400Hz
If a cable run measured on a drawing with a scale of 1:25 is 65 cm, what is the actual length of
the cable run? - correct answer16.25 m
The right to a fair trial is covered under which of the following Acts? - correct answerHuman
Rights Act
A room of width 2.6m is to be represented on a drawing with a scale of 1:50, what length would
this appear as on the drawing in - correct answer5.2cm
When preparing an estimate the main cost considerations are? - correct answerLabour,
Materials and plant