100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PJM GENERATION DISPATCH EXAM 200 QUESTIONS & CORRECT ANSWERS LATEST 2025

Rating
-
Sold
-
Pages
70
Grade
A+
Uploaded on
09-07-2025
Written in
2024/2025

PJM GENERATION DISPATCH EXAM 200 QUESTIONS & CORRECT ANSWERS LATEST 2025

Institution
PJM GENERATION DISPATCH
Course
PJM GENERATION DISPATCH











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM GENERATION DISPATCH
Course
PJM GENERATION DISPATCH

Document information

Uploaded on
July 9, 2025
Number of pages
70
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM GENERATION DISPATCH EXAM 200 QUESTIONS
& CORRECT ANSWERS LATEST 2025




Which of the following statements is correct concerning PJM assuming frequency
control of the restoration process?


A) PJM assumes control once an external transmission tie has been established.
B) Once an Area Control Error can be calculated, PJM will assume control.
C) Whenever it becomes too much of a burden for any one Transmission Owner
within the RTO
D) Whenever the Transmission Owners within the RTO agree to let PJM control
the process. - ANSWER-C) Whenever it becomes too much of a burden for any
one Transmission Owner within the RTO


During black start restoration, priority access to cranking power should be given
to:


A) Hot units that can return to service immediately.
B) Combustion turbines in areas where the initial disturbance occurred
C)Units with black start capability
D) Hydro Units - ANSWER-A) Hot units that can return to service immediately.


During a restoration, if you are presented with the opportunity to re-connect with
the Eastern Interconnection, you should:

,A)Not pursue this opportunity because you may cause the Eastern
Interconnection to become unstable.
B) Pursue this opportunity only when you have adequate Dynamic Reserves on
your system
C) Pursue this opportunity as quickly as possible
D) Pursue this opportunity only if you need cranking power for your generating
unity - ANSWER-C) Pursue this opportunity as quickly as possible


Complete (Total System) Blackouts are characterized by which of the following?


1 - Most common type of blackout
2 - May require coordinating multiple islands
3 - Likely to result in Transmission overloads or other issues
4 - Affects a very large geographical area, and many customers
5 - Most commonly caused by human or switching errors


A) 1 & 3
B) 2 & 4
C) 3 & 5
D) 1 - ANSWER-B) 2 & 4


The first step in a system restoration would be to:


A) Immediately notify the media of the event

,B) Restore as much of the area load as possible
C) Restore as much under-frequency load as possible
D) Verify that communication is functional with your neighbors - ANSWER-D)
Verify that communication is functional with your neighbors


Why would an offsite power to generating facilities be a priority during the
restoration process?


A) To provide safe shutdown power for the units
B) To meet FERC requirements
C) To provide adequate lighting for the plant operators to attempt a restart
D) To prepare and expedite the return of the unit - ANSWER-D) To prepare and
expedite the return of the unit


Factors that help determine the sequence of restoration of off-line generation
include (Pick 2):


-Generation Type
-Unloaded Capacity
-Unit Availability
-Stability of the Generator - ANSWER--Generation Type
-Unit Availability


How often should a Transmission company file an updated restoration report with
PJM?

, 1 - Every 30 minutes
2 - Every hour
3 - Every 10 lines that have been restored
4 - Every 5 lines that have been restored


A) 1 & 4
B) 2 & 3
C) 1 & 3
D) 2 & 4 - ANSWER-C) 1 & 3


Which of the following statements are true concerning delays in restoring
auxiliary power to off-line generation?


1 - The unit could suffer turbine shaft damage
2 - The fuel oil for the unit could congeal
3 - The startup time for the unit will be reduced
4 - The battery life used to maintain critical systems may run out


A) 1, 2 and 3
B) 1, 2 and 4
C) 1, 3 and 4
D) 2, 3 and 4 - ANSWER-B) 1, 2 and 4


During system restoration, the two categories of reserves are:

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseSue Johns Hopkins University
View profile
Follow You need to be logged in order to follow users or courses
Sold
49
Member since
2 year
Number of followers
4
Documents
1010
Last sold
4 weeks ago

3.9

8 reviews

5
4
4
1
3
2
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions