SUBGRADE & BASE INSPECTION – FDOT EXAM QUESTIONS WITH COMPLETE SOLUTIONS

Institution
FDOT
Course
FDOT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT
Course
FDOT

Document information

Uploaded on
July 6, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SUBGRADE & BASE INSPECTION –
FDOT EXAM QUESTIONS WITH
COMPLETE SOLUTIONS
What is the time limit for placement of the central-plant mixture in adjacent passes? -
Answer-30 minutes

Is the dumping of soil-cement mixtures in piles or windrows on the subgrade
acceptable? - Answer-No

What should you use to check the depth of cement-treated subgrades? - Answer--
Smooth metal rod
-Jack
-Stringline

What tool should you use in checking for uniformity of mixing - Answer-Posthole digger

In a mixed, cement-treated subgrade, there should be no soil particles larger than __ -
Answer-1'' in diameter

For cement-treated subgrades, where are the maximum density and optimum moisture
values determined?

Who makes these determinations? - Answer--In the field

-Inspector

When is the earliest that compaction can be started after mixing has been completed?
___ When is the latest? ___ - Answer-Immediately; Not later than 60 minutes

Cement-treated subgrades must be compacted to at least __ percent of the maximum
density. - Answer-95

Areas of the subgrade that need additional soil-cement mixture in order to comply with
the plans must first be lightly __. - Answer-Scarified

Should cement-treated subgrade surface higher or lower from plan grade to be
corrected? - Answer-Yes

Cement-treated subgrades of up to 6-inch specified thickness must not have thickness
deficiencies greater than __ - Answer-1/2 inch

, How is moisture retained in the subgrade BEFORE asphalt is applied? - Answer-By
sprinkling

How long is the curing period? (Cement treated subgrades) - Answer-7 days

What three things should you verify during curing coat application? - Answer--
Application at a specified rate
-Complete uniform coverage
-Sanding of asphaltic material with acceptable aggregate

How many different kinds of base courses are included in the Standard Specifications? -
Answer-9

The purpose of a base course is to __. - Answer-Support the pavement

For tangent sections, the maximum interval for setting the stakes along the roadway is
__ feet. - Answer-50

Generally, grade stakes are offset __ feet from the edge of mixing operations. - Answer-
3

Are blue tops sometimes set after the base material is placed and balanced? - Answer-
Yes

Sometimes blue tops are covered by the construction operations. Why must they be
uncovered? - Answer-So that the motor grader operator can clip over the top

If you are to be the Base Inspector and did not inspect the subgrade operations, should
you assume the subgrade meets all the requirements? - Answer-No

Must spongy areas and ruts in the subgrade be corrected BEFORE the beginning of
base course operations? - Answer-Yes

Do the contract plans govern over the special provisions? - Answer-No

List three general requirements for all equipment used in subgrade operations: -
Answer--Be in good condition
-Operate safely
-Produce desired results

How are spread distances marked? - Answer-Stakes

A certain transport holds 42,360 pounds of cement. The design application rate is 30
pounds. The subgrade is 21 feet wide. What is the spread distance for this particular
transport? __ (to the nearest foot) - Answer-605 feet

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
250
Member since
2 year
Number of followers
68
Documents
18071
Last sold
1 week ago

4.0

38 reviews

5
22
4
4
3
6
2
2
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions