100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

FDEP EXAM QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
06-07-2025
Written in
2024/2025

FDEP EXAM QUESTIONS AND ANSWERS

Institution
FDOT
Course
FDOT








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT
Course
FDOT

Document information

Uploaded on
July 6, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDEP EXAM QUESTIONS AND ANSWERS
——————- is the only factor in the universal soil loss equation which is beyond the
developers control - Answer-Rainfall erosion index

———————- are the factors most easily manipulated by the developer - Answer-Slope
length and gradient and cover factor

Inside the —————— water management district boundary you would run Tallahassee
construction projects - Answer-Northwest Florida

The requirements of the Florida NPDES construction genetic permit include posting a copy of
the NOI or acknowledgement letter, development and implementation of the SWPPP and
conducting inspections and retention of records - Answer-True

Which activities along with clearing grading and excavating are considered to also meet the
definition of construction activity - Answer-Demolition activities

The NPDES stormwater program regulates construction activities that disturb ——— or more
acres of land and discharges stormwater to surges waters of the state or an MS4 - Answer-1
acre

Construction projects in Miami fall within the boundaries of the ———— water management
district - Answer-South Florida

The operator has 30 days to update or revise the SWPPP when site conditions have
changed - Answer-False

Which of the following is required content for a SWPPP - Answer-A site map, a narrative
description, a signed and dated certification statement

During phase 1 of construction, even the smallest sites will require installation of ————
control practices prior to site development - Answer-Perimeter

During phase 2 of construction the components of the permanent ————— are constructed
and connected to the ————- - Answer-Stormwater system, stormwater facilities

Never device construction equipment near a live stream use storm sewers instead - Answer-
False

Apply ————— practices to protect the disturbed area from off site runoff and protect
offsite areas from sediment damage. - Answer-Perimeter control

Apply —————- practices to prevent excessive on site damage - Answer-Erosion control

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
250
Member since
2 year
Number of followers
68
Documents
18071
Last sold
1 week ago

4.0

38 reviews

5
22
4
4
3
6
2
2
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions