100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Valid BICSI RCDDv15 Dumps (V8.02) for First-Attempt Complete

Rating
-
Sold
-
Pages
31
Grade
A+
Uploaded on
03-07-2025
Written in
2024/2025

Passing your RCDDv15 BICSI Registered Communications Distribution Designer - RCDD v15 exam will validate your skills and help you advance into a more technical role. DumpsBase offers valid BICSI RCDDv15 dumps (V8.02) that are specifically designed to match the latest exam format and objectives. With the right study strategy, quality resources, and these valid RCDDv15 dumps, you can approach the BICSI RCDDv15 exam with confidence and clarity. #RCDDv15

Show more Read less
Institution
Self Learning
Course
Self Learning











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Self Learning
Course
Self Learning

Document information

Uploaded on
July 3, 2025
Number of pages
31
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

DUMPS
BASE
EXAM DUMPS

BICSI
RCDDv15
28% OFF Automatically For You

BICSI Registered Communications Distribution
Designer - RCDD v15

,1.A municipal agency manages a city's water and wastewater infrastructure. A
regulation requires the replacement of sewer lines throughout the city at a cost of
US$2 billion over 30 years
The city has been managing this program with various program teams, and has a
project controls office In place to track protects separate from the program
management team A program manager is hired to standardize all deliverables from
component projects under the program.
What should the program manager do next?
A. Develop a program management framework
B. Create a program performance analysis report
C. Generate a program charter
D. Establish a program management office (PMO)
Answer: A




e
et
pl
om
2.What is the derating factor for a 24 AWG (0.51 mm) stranded cords?




C
pt
A. 10%



em
B. 20%


tt
-A
C. 30%
t
rs
D. 50%
Fi


E. 60%
r
fo




Answer: B
)
02
8.
(V
ps




3.Which two of the following apply during a project’s close out process? (Choose
um




two.)
D
5




A. Communicate discrepancies to responsible parties.
v1
D




B. Begin testing of installed infrastructure.
D
C




C. Evaluate the surroundings of the project and report back to the communications
R
I




distribution professional of these findings.
S
IC




D. Hire legal council for representation.
B
id




E. Create schedule for completion of punch list.
al
V




Answer: A,E


4.Which type of protection for electrical power stations provide isolation against a rise
in potential of station ground and also provide drainage protection against
longitudinally-induced voltages?
A. Isolating transformers
B. Neutralizing transformers
C. Mutual drainage reactors
D. Unit-type neutralizing transformers
E. 2-winding neutralizing transformers

,Answer: B


5.Company A recently signed a contract with a strategic business partner, Company
B, to jointly roll out a new technology Company B is excited about the joint marketing
opportunity Company A's component Quality Assurance team has expressed
concerns to you the program manager, Ural the product is being rolled out
prematurely and has identified potential issues with backend support systems. QA,
however, assures you that a manual work around is possible, but not ideal Company
B requests an enhancement to the new product. In a meeting with Company B, you
determine that additional funding will be required and resources allocated and
scheduled
What is your MOST appropriate next step?




e
et
A. Secure funding from another project that was cancelled




pl
B. Use an integrated change control process




om
C. Use the available management reserve




C
pt
D. Advise Company B that funding and resources are not available



em
Answer: B


tt
-A
t
rs
Fi


6.Several issues are identified on one component project in a program During a
r
fo




meeting with that component's project manager, the program manager offers several
)
02




suggested resolutions Two weeks later, they meet again to review progress. The
8.
(V




project manager had reviewed the issues and suggested resolutions, but delayed a
ps




decision. This two-week delay in taking action caused delays in the project schedule
um




What should the program manager do?
D
5




A. Join project-level issue resolution meetings to accelerate the decision-making
v1
D




process.
D
C




B. Initiate discussions with the program governance board about assigning a more
R
I




experienced project manager to the project
S
IC




C. Emphasize that the project manager needs to address the issues and follow up at
B
id




the next scheduled meeting
al
V




D. Develop an immediate corrective action plan with the project manager and coach
them on decision-making responsibilities
Answer: D


7.When planning a telecommunication termination area, what is the estimated space
needed to terminate 144 strands of optical fiber?
A. 6350.01 mm2 (250 in2)
B. 7315.21 mm2 (288 in2)
C. 8890.01 mm2 (350 in2)
D. 10972.82 mm2 (432 a)

, E. 14376.43 mm2 (566 in2)
Answer: B


8.DRAG DROP
Identify the fibers below as either single mode (SM) or multi-mode (MM) by dragging
the appropriate term into each oval.




e
et
pl
om
C
pt
em
tt
-At
rs
Fi
r
fo
)
02
8.
(V




Answer:
ps
um
D
5
v1
D
D
C
R
I
S
IC
B
id
al
V
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
greencheryl

Get to know the seller

Seller avatar
greencheryl Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
101
Member since
2 year
Number of followers
31
Documents
251
Last sold
6 hours ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions