BASE
EXAM DUMPS
BICSI
RCDDv15
28% OFF Automatically For You
BICSI Registered Communications Distribution
Designer - RCDD v15
,1.A municipal agency manages a city's water and wastewater infrastructure. A
regulation requires the replacement of sewer lines throughout the city at a cost of
US$2 billion over 30 years
The city has been managing this program with various program teams, and has a
project controls office In place to track protects separate from the program
management team A program manager is hired to standardize all deliverables from
component projects under the program.
What should the program manager do next?
A. Develop a program management framework
B. Create a program performance analysis report
C. Generate a program charter
D. Establish a program management office (PMO)
Answer: A
e
et
pl
om
2.What is the derating factor for a 24 AWG (0.51 mm) stranded cords?
C
pt
A. 10%
em
B. 20%
tt
-A
C. 30%
t
rs
D. 50%
Fi
E. 60%
r
fo
Answer: B
)
02
8.
(V
ps
3.Which two of the following apply during a project’s close out process? (Choose
um
two.)
D
5
A. Communicate discrepancies to responsible parties.
v1
D
B. Begin testing of installed infrastructure.
D
C
C. Evaluate the surroundings of the project and report back to the communications
R
I
distribution professional of these findings.
S
IC
D. Hire legal council for representation.
B
id
E. Create schedule for completion of punch list.
al
V
Answer: A,E
4.Which type of protection for electrical power stations provide isolation against a rise
in potential of station ground and also provide drainage protection against
longitudinally-induced voltages?
A. Isolating transformers
B. Neutralizing transformers
C. Mutual drainage reactors
D. Unit-type neutralizing transformers
E. 2-winding neutralizing transformers
,Answer: B
5.Company A recently signed a contract with a strategic business partner, Company
B, to jointly roll out a new technology Company B is excited about the joint marketing
opportunity Company A's component Quality Assurance team has expressed
concerns to you the program manager, Ural the product is being rolled out
prematurely and has identified potential issues with backend support systems. QA,
however, assures you that a manual work around is possible, but not ideal Company
B requests an enhancement to the new product. In a meeting with Company B, you
determine that additional funding will be required and resources allocated and
scheduled
What is your MOST appropriate next step?
e
et
A. Secure funding from another project that was cancelled
pl
B. Use an integrated change control process
om
C. Use the available management reserve
C
pt
D. Advise Company B that funding and resources are not available
em
Answer: B
tt
-A
t
rs
Fi
6.Several issues are identified on one component project in a program During a
r
fo
meeting with that component's project manager, the program manager offers several
)
02
suggested resolutions Two weeks later, they meet again to review progress. The
8.
(V
project manager had reviewed the issues and suggested resolutions, but delayed a
ps
decision. This two-week delay in taking action caused delays in the project schedule
um
What should the program manager do?
D
5
A. Join project-level issue resolution meetings to accelerate the decision-making
v1
D
process.
D
C
B. Initiate discussions with the program governance board about assigning a more
R
I
experienced project manager to the project
S
IC
C. Emphasize that the project manager needs to address the issues and follow up at
B
id
the next scheduled meeting
al
V
D. Develop an immediate corrective action plan with the project manager and coach
them on decision-making responsibilities
Answer: D
7.When planning a telecommunication termination area, what is the estimated space
needed to terminate 144 strands of optical fiber?
A. 6350.01 mm2 (250 in2)
B. 7315.21 mm2 (288 in2)
C. 8890.01 mm2 (350 in2)
D. 10972.82 mm2 (432 a)
, E. 14376.43 mm2 (566 in2)
Answer: B
8.DRAG DROP
Identify the fibers below as either single mode (SM) or multi-mode (MM) by dragging
the appropriate term into each oval.
e
et
pl
om
C
pt
em
tt
-At
rs
Fi
r
fo
)
02
8.
(V
Answer:
ps
um
D
5
v1
D
D
C
R
I
S
IC
B
id
al
V