What are the Concept, Definition, Deployment,
stages of a Transition
linear life cycle?
,What is the best Linear life cycle
type of life
cycle to use for
a stable low-risk
project?
State the three Linear, Iterative, Hybrid
types of life
cycle.
What is the main It repeats one of more phases
characteristic of
an iterative life
cycle?
When is an If the project scope is vague, or if
iterative life the solutions are unclear
cycle
beneficial?
What are the Assemble, Review, Deploy
three stages of
Evolutionary
Development in
an Iterative
lifecycle?
,What is the It adds iteration to a linear life
definition of a cycle to enable a mix of
hybrid life approaches
cycle?
Give one A project life cycle contains the
difference phases up to transition and closure,
between a whereas an extended life cycle
Project Life goes beyond the transition and
Cycle and an closure phase to include the
Extended Life benefits realisation phase and
Cycle? adoption of outputs.
What are the Adoption, Benefits Realisation
two extra
phases of an
Extended life
cycle?
, A project lifecycle focuses on
What are the documentation required for project
different execution and closure, such as
Documentation project plans, progress reports,
Requirements and final reviews.
for a Project An extended lifecycle requires
lifecycle vs. an comprehensive documentation that
Extended extends into operational manuals,
lifecycle? long-term maintenance schedules,
and end user support materials.
Project Lifecycle - Changes are
managed within the confines of the
How are project's timeline and aim to
Changes minimise disruptions to the initial
Managed for a plan.
Project lifecycle Extended lifecycle - Incorporates
vs. an Extended continuous change management to
lifecycle? adapt to evolving technologies,
user requirements, and operational
challenges over time.
2025/2026 BANK CURRENTLY
TESTING 2 VERSIONS (VERSION A
AND B) AND STUDY GUIDE
COMPLETE EXAM QUESTIONS
WITH DETAILED VERIFIED
ANSWERS
Save
Terms in this set (195)
What are the Concept, Definition, Deployment,
stages of a Transition
linear life cycle?
,What is the best Linear life cycle
type of life
cycle to use for
a stable low-risk
project?
State the three Linear, Iterative, Hybrid
types of life
cycle.
What is the main It repeats one of more phases
characteristic of
an iterative life
cycle?
When is an If the project scope is vague, or if
iterative life the solutions are unclear
cycle
beneficial?
What are the Assemble, Review, Deploy
three stages of
Evolutionary
Development in
an Iterative
lifecycle?
,What is the It adds iteration to a linear life
definition of a cycle to enable a mix of
hybrid life approaches
cycle?
Give one A project life cycle contains the
difference phases up to transition and closure,
between a whereas an extended life cycle
Project Life goes beyond the transition and
Cycle and an closure phase to include the
Extended Life benefits realisation phase and
Cycle? adoption of outputs.
What are the Adoption, Benefits Realisation
two extra
phases of an
Extended life
cycle?
, A project lifecycle focuses on
What are the documentation required for project
different execution and closure, such as
Documentation project plans, progress reports,
Requirements and final reviews.
for a Project An extended lifecycle requires
lifecycle vs. an comprehensive documentation that
Extended extends into operational manuals,
lifecycle? long-term maintenance schedules,
and end user support materials.
Project Lifecycle - Changes are
managed within the confines of the
How are project's timeline and aim to
Changes minimise disruptions to the initial
Managed for a plan.
Project lifecycle Extended lifecycle - Incorporates
vs. an Extended continuous change management to
lifecycle? adapt to evolving technologies,
user requirements, and operational
challenges over time.