VERSION WITH UPDATED QUESTIONS AND ACCURATE
DETAILED ANSWERS \VERIFIED 100% ALREADY
GRADED A+||LATEST UPDATE
Placing a bare copper D. dispenser pipe run to the tank turbine
wire from the ____ to the ____
with it's ends exposed is
helpful with pipe run
locating.
A. tank monitor to
emergency shut-off switch
B. tank to turbine
C. vapor recovery bucket
to interstitial monitor
D. dispenser pipe run to
the tank turbine
,One of the approved C. 95
methods of overfill
prevention is to have an
overfill device that will
automatically shut off fill
into the tank when the
tank is a maximum of ___ %
full.
A. 80
B. 90
C. 95
D. 75
In the PEI #300 manual, A. CARB
pressure decay, dynamic
back pressure, and A/L
testing satisfy who's
testing requirements?
A. CARB
B. water resources
C. environmental health
D. fire department
, When removing liquid A. be managed as hazardous waste
from a sump or spill
bucket and the liquid
contains fuel, it must __ ?
A. be managed as
hazardous waste
B. pumped into a bucket
to evaporate
C. scooped or bailed onto
the concrete pad to
evaporate
D. put into a sealed
container, then put into
the trash container
Before working on any A. NFPA
electrical circuits always
de-energize and use
A. NFPA
B. OSHA
C. ICC
D. UBC
The two point Phase I D. vapor recovery adaptor
vapor recovery system
requires that a separate
vapor recovery riser pipe
be installed in the tank
and be equipped with a
____?
A. drop-tube
B. locking block valve
C. P/V vent
D. vapor recovery adaptor