S12 SPRINKLER TEST QUESTIONS AND
ANSWERS
THE b__________ bIS bRESPONSIBLE bTO bMAINTAIN bSPRINKLER bSYS. bAND bTO
bDETERMINE bQUALIFICATIONS. b- bcorrect banswer✔✔OWNER
RECORDS bOF bALL bINSPECTIONS bAND bMX bSHALL bBE bMAINTAINED bON
bPREMISES bFOR bA bMIN. bOF b__________ bYEARS. b- bcorrect banswer✔✔3
THE bBUILDING bOWNER bSHALL bASSIGN bA(N) b____________ bTO bCOMPLY
bWITH bREQUIREMENTS. b- bcorrect banswer✔✔IMPAIRMENT bCOORDINATOR
REGULAR bMX bAND bMINOR bREPAIRS bNOT bAFFECTING bMORE bTHAN
b________ bFLOOR(S) bARE bCONSIDERED bPLANNED bREMOVAL bFROM
bSERVICE. b- bcorrect banswer✔✔1
SHUTDOWNS bAFFECTING bMORE bTHAN b_________ bFLOOR(S) bARE
bCONSIDERED bUNPLANNED bOUT bOF bSERVICE bCONDITIONS. b- bcorrect
banswer✔✔1
NOTIFICATION bTO bFDNY bIS bNOT bREQUIRED, bPROVIDED bSYSTEM bIS
bRETURNED bTO bSERVICE bWITHIN b______ bHOURS. b- bcorrect banswer✔✔8
FOR bUNPLANNED bREMOVAL bFROM bSERVICE, bTHE bCOF bHOLDER bSHALL
bIMMEDIATELY bREPORT bCONDITION bTO bTHE b___________ bAND bTHE bFIRE
bDEPT. b- bcorrect banswer✔✔OWNER bOF bTHE bBUILDING
IF bA bMINOR bDEFECT bIS bOBSERVED, bIT bSHALL bBE bCORRECTED bWITHIN
b_________ bDAYS bOR bIT bWILL bBE bCONSIDERED bAN bIMPAIRMENT. b- bcorrect
banswer✔✔30
WHAT bDOES b"OOS" bSTAND bFOR? b- bcorrect banswer✔✔OUT bOF bSERVICE
OOS bSYSTEMS bSHALL bBE bIDENTIFIED bBY bPLACING b________ bAT bFIRE
bDEPT. bCONNECTIONS, bSYS. bCONTROL bVALVES, bAND bFIRE bCOMMAND
bCENTER b- bcorrect banswer✔✔TAGS
,A b_______ bSHALL bBE bREQUIRED bTO bPOST bTAGS bAT bMAIN bCONTROL
bVALVE bAND bANY bSECTIONAL bVALVES. b- bcorrect banswer✔✔MASTER bFIRE
bSUPPRESSION bPIPING bCONTRACTOR
__________ bSHALL bBE bPOSTED bON bTHE bTAG bINDICATING bBOTH bSTATIC
bAND bFLOW bPRESSURES bBEFORE bAND bAFTER. b- bcorrect banswer✔✔DRAIN
bTEST bRESULTS
GREEN bTAGS bINDICATE bTHAT b__________. b- bcorrect banswer✔✔NO
bIMPAIRMENT bWAS bFOUND
GREEN bTAGS bWILL bBE bPLACED bON bTHE b____________. b- bcorrect
banswer✔✔MAIN bCONTROL bVALVE
SYSTEMS bPARTIALLY bOR bFULLY bOUT bOF bSERVICE bSHALL bHAVE bA
b____________ bTAG bPLACED bON bTHE bMAIN bCONTROL bVALVE. b- bcorrect
banswer✔✔RED
A b_________ bDISC bOF b8-9 bINCHES bSHALL bBE bPLACED bON bCONNECTIONS
bTO bINDICATE bTHE bSYSTEM bIS bFULLY bOUT bOF bSERVICE. b- bcorrect
banswer✔✔WHITE
A b________ bDISC bOF b8-9 bINCHES bSHALL bBE bPLACED bON bCONNECTIONS
bTO bINDICATE bTHE bSYSTEM bIS bPARTIALLY bOUT bOF bSERVICE. b- bcorrect
banswer✔✔BLUE
THE bIMPAIRMENT bCOORDINATOR bWILL bNOTIFY bTHE b___________ bCARRIER,
bCENTRAL bSTATION bAND bOCCUPANTS. b- bcorrect banswer✔✔INSURANCE
PRIOR bTO bRETURNING bA bSYS. bTO bSERVICE, bTHE b___________ bSHALL
bENSURE bTHAT bNECESSARY bTESTS bAND bINSPECTIONS bARE bCONDUCTED. b-
bcorrect banswer✔✔IMPAIRMENT bCOORDINATOR
GLYCERIN bNOT bGREATER bTHAN b_________ bPERCENT bOR bGLYCOL bNOT
bGREATHER bTHAN b________ bPERCENT bSHALL bBE bUSED bTO bPROTECT
bFROM bFREEZING. b- bcorrect banswer✔✔50, b40
THE bCOF bNUMBER bAND bSIGNATURE bOF bCOF bHOLDER bSHALL bBE bPOSTED
bNEAR bTHE b____________. b- bcorrect banswer✔✔MAIN bCONTROL bVALVE
__________ bSHALL bBE bREADILY bAVAILABLE bTO bANY bREPRESENTATIVE bOF
bTHE bFIRE bDEPT. bTHESE bARE bTO bBE bMAINTAINED bON bSITE bFOR b3 bYEARS.
b- bcorrect banswer✔✔RECORDS
, FAILURE bTO bMAKE bINSPECTIONS bMAY bRESULT bIN b__________ bOF bTHE bCOF
bAND bCOURT bPROCEEDINGS. b- bcorrect banswer✔✔REVOCATION
THE bCOF bHOLDER bMAY bINSPECT, bTEST, bAND bPERFORM bROUTINE bMX bIF
bTHEY bHOLD bTHE bFOLLOWING bCERTS: b- bcorrect banswer✔✔REFRIGERATION
bOPERATING bENGINEER, bHIGH bPRESSURE bOPERATING bENGINEER, bAND
bNYS bHIGH bPRESSURE bOPERATING bENGINEER.
A b________ bCAN bINSPECT, bMAINTAIN, bTEST, bAND bREPAIR bALL bFIRE
bSTANDPIPE bAND bSPRINKLER bSYSTEMS. b- bcorrect banswer✔✔MASTER bFIRE
bSUPPRESSION bPIPING bCONTRACTOR b(MFSPC)
A bMASTER bPLUMBER b(MP) bWITH bCOF bIS bLIMITED bTO bRESIDENTIAL
bOCCUPANCIES bWITH b_________ bSPRINKLER bHEADS bOR bLESS. b- bcorrect
banswer✔✔30
ABOUT b______ bPERCENT bOF bFIRES bARE bEXTINGUISHED bOR bCONTROLLED
bWHEN bSPRINKLERS bARE bINSTALLED. b- bcorrect banswer✔✔96
WET bPIPE bSYSTEMS bHAVE bWATER bAT bA bMINIMUM bTEMP. bOF b_______ bTO
bPREVENT bTHE bSYSTEM bFROM bFREEZING. b- bcorrect banswer✔✔40
bFAHRENHEIT
__________ bVALVES bARE bNO bLONGER bPERMITTED bTO bBE bINSTALLED. b-
bcorrect banswer✔✔COLD bWEATHER
________ bSYSTEMS bARE bINSTALLED bWHERE bA bWET bPIPE bSYSTEM bCANNOT
bBE bHEATED bTO bPREVENT bFREEZING. b- bcorrect banswer✔✔DRY bPIPE
THE bDROP bIN b________ bCAUSES bA bSPECIAL bDRY bPIPE bVALVE bTO bOPEN. b-
bcorrect banswer✔✔AIR bPRESSURE
IN bBUILDINGS bWHERE bLIFE bHAZARD bIS bHIGH b(SCHOOLS, bHOSPITALS) bTHE
bALARM bIS bTRANSMITTED bDIRECTLY bTO bTHE b_________. b- bcorrect
banswer✔✔FIRE bDEPARTMENT
DRY bPIPE bVALVES bARE bOF bA b______ bDESIGN. b- bcorrect banswer✔✔CLAPPER
DRY bPIPE bVALVES bARE bUSUALLY bSET bAT b________ bPSI bABOVE bTHE
bNORMAL bTRIP bLEVEL. b- bcorrect banswer✔✔15-20
AN bACCELERATOR bAND bEXHAUSTER bARE bUSED bTO b_______THE bTIME bTO
bALLOW bWATER bINTO bTHE bSYSTEM. b- bcorrect banswer✔✔REDUCE
BOTH bACCLERATOR bAND bEXHAUSTER bARE bACTIVATED bWHEN bA bDROP bOF
b_______ bPSI bIS bDETECTED bIN bTHE bSYSTEM. b- bcorrect banswer✔✔2