100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

PJM TEST TO PRACTICE QUESTIONS & ANSWERS

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
24-06-2025
Written in
2024/2025

PJM TEST TO PRACTICE QUESTIONS & ANSWERS

Institution
PJM
Course
PJM










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
June 24, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM TEST TO PRACTICE QUESTIONS & ANSWERS
When SCADA data points are out of service for an extended period of time, data should
Be updated manually by the operator at least every:

A. 10 minutes
B. 20 minutes
C. 30 minutes
D. 60 minutes - Answers - C. 30 minutes

PJM requires that LCCs that are starting an outage on reportable transmission facilities
must obtain PJM approval prior to removing the facility from service. How many minutes
prior to the commencement of switching must be provided for PJM to study and give
final approval?

A. 15
B. 30
C. 45
D. 60 - Answers - B. 30

According to PJM emergency procedures, what two types of reserves are monitored
during a system restoration?

A. spinning and regulating
B. primary and secondary
C. dynamic and regulation
D. dynamic and synchronized - Answers - D. dynamic and synchronized

What are the under frequency relay settings for PJM member companies?

A. 59.30 Hz, 58.90 Hz, 58.50 Hz
B. 59.50 Hz, 58.50 Hz, 57.50 Hz
C. 59.00 Hz, 58.00 Hz, 57.00 Hz
D. 59.70 Hz, 59.50 Hz, 59.30 Hz - Answers - A. 59.30 Hz, 58.90 Hz, 58.50 Hz

What two components make-up Contingency Reserve?

A. Synchronized and Non-synchronized
B. Non-synchronized and secondary
C. Synchronized and secondary
D. Non-synchronized and regulation - Answers - A. Synchronized and Non-
synchronized

During restoration, if 500 kV transmission lines are being restored, what are the
minimum source requirements for load and generation?

,A. 10 MW of load per mile and 15 MW of generation per mile
B. 20 MW of load per mile and 30 MW of generation per mile
C. 25 MW of load per mile and 50 MW of generation per mile
D. 30 MW of load per mile and 50 MW of generation per mile - Answers - B. 20 MW of
load per mile and 30 MW of generation per mile

During restoration situations, dynamic reserve generator load pick-up factors are
defined as which of the following?

A. Steam capacity -25%, Combustion Turbine capacity -15%, and hydro capacity -5%
B. Steam capacity -5%, Combustion Turbine capacity -15%, and hydro capacity -25%
C. Steam capacity -5%, Combustion Turbine capacity -25%, and hydro capacity -15%
D. Steam capacity -15%, Combustion Turbine capacity -10%, and hydro capacity -25%
- Answers - C. Steam capacity -5%, Combustion Turbine capacity -25%, and hydro
capacity -15%

What are the time requirements for a PJM member to submit planned transmission
outages that are used for system planning purposes?

A. 3 days prior to outage
B. 1 week prior to the outage
C. 1 month prior to the outage
D. 12 months prior to the outage - Answers - D. 12 months prior to the outage

If a 500 kV transmission line is scheduled to be removed from service for a daily
maintenance job, what is the minimum notification time to get final approval from the
PJM operator?

A. 15 minutes
B. 30 minutes
C. 24 hours
D. 72 hours - Answers - B. 30 minutes

What is the time limit for PJM members to submit transmission outages for PJM
approval?

A. 24 hours
B. 3 business days
C. 1 week
D. 90 days - Answers - B. 3 business days

Your outage scheduling group has scheduled a planned outage to start today at 0800.
Unfortunately due to weather, the outage will not start until tomorrow at 0700. What
must you do in order to update the outage in the eDart application?

A. Leave the start time unchanged

, B. Enter a new outage ticket for the equipment with the new start time
C. Request that PJM unlock the ticket in eDart and revise the ticket
D. Cancel the outage ticket - Answers - C. Request that PJM unlock the ticket in eDart
and revise the ticket

Which of the following information would you NOT report on a Reactive Reserve
Check?

A. MVAR reserve on generators that are synchronized
B. MVAR output of generators that are synchronized
C. MVAR available on quick-start generators
D. Unconnected transmission capacitors' MVAR capability - Answers - B. MVAR
output of generators that are synchronized

PJM Transmission Operators are required to provide PJM with four sets of thermal
limits for all facilities monitored by PJM. Which of the following is NOT one of the four?

A. Actual
B. Normal
C. Short-term emergency
D. Load dump - Answers - A. Actual

The PJM system operator finds that a 230 kV transmission line is over its normal limit.
How long does the operator have to return the line to within its normal limit?

A. Immediately
B. 5 minutes
C. 15 minutes
D. 30 minutes - Answers - C. 15 minutes

When would PJM issue a Heavy Load Voltage Schedule?

A. When loads are heavy and bulk power voltage levels are expected to be low
B. When Virginia Power or NY-ISO is experiencing high loads
C. When a PJM member system is experiencing a new system peak load
D. When PJM has projected that they will experience problems in meeting their CPS
criteria - Answers - A. When loads are heavy and bulk power voltage levels are
expected to be low

Which temperature range makes up the PJM "Summer Value" temperature sets?

A. 41°F to 77°F
B. 50°F to 77°F
C. 68°F to 86°F
D. 68°F to 95°F - Answers - D. 68°F to 95°F

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2009
Member since
3 year
Number of followers
1447
Documents
48320
Last sold
1 day ago

3.8

345 reviews

5
172
4
61
3
44
2
16
1
52

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions