ARE 5.0 NCARB UPDATED ACTUAL Exam Questions and CORRECT Answers Public - CORRECT ANSWER - Which of the following methods of bidding is required on most projects for which government funds are to be used? A. Direct B. Negotiated C. Invited D. Public Fast track - CORRECT ANSWER - Which of the following project delivery methods always requires preparation of several individual bid-document packages?

Show more Read less
Institution
NCARB
Course
NCARB










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCARB
Course
NCARB

Document information

Uploaded on
June 24, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

ARE 5.0 NCARB UPDATED ACTUAL
Exam Questions and CORRECT Answers
Public - CORRECT ANSWER - Which of the following methods of bidding is required on
most projects for which government funds are to be used?


A. Direct
B. Negotiated
C. Invited
D. Public


Fast track - CORRECT ANSWER - Which of the following project delivery methods
always requires preparation of several individual bid-document packages?


A. Design-Bid-Build
B. Fast Track
C. Design Build
D. Turnkey


Specifications - CORRECT ANSWER - diagram on paper



recommend qualified contractors - CORRECT ANSWER - In developing a list of bidders
for a private project, the architect's role is to


A. select the contractor
B. recommend qualified contractors
C. rank the contractors in order of preference
D. discourage owner-recommended contractors

,surety - CORRECT ANSWER - A contractor's ability to obtain a performance bond for a
specific contract is determined by the


A. owner
B. architect
C. contractor
D. surety


Financial statment - CORRECT ANSWER - AIA Document A305, Contractor's
Qualification Statement, requires which of the following supplemental documents to be provided
by the applicant?


A. financial statement
B. list of subcontractors
C. list of proposed consultants
D. list of proposed material suppliers


Has the right to waive irregularities and accept the bid - CORRECT ANSWER - After
considering all the bids, the owner favors a bid with irregularities. According to AIA Document
A701, Instructions to Bidders, the owner has which of the following rights/responsibilities
regarding an irregular bid?


A. Has the right to waive irregularities and accept the Bid
B. Has the right to extend the bidding period for corrections
C. Must informally request corrections from the bidder
D. Must only consider bids without irregularities


multiple prime contracts - CORRECT ANSWER - A local bank has a budget of
$30,000,000 to construct a new main office. The bank wants to use contractors who are
customers of the bank; however, none of the bank's contractor customers can bond the entire

, amount of the contract. Which of the following delivery methods would be best suited to meeting
the bank's contractor selection goal?


A. Design-Build
B. Fast-Track
C. Multiple-Prime Contracts
D. Additive change Orders


notification of future addenda - CORRECT ANSWER - Which of the following is an
appropriate item for the prebid conference?


A. Occupancy-permit procedures
B. Notification of future addenda
C. Pre-commissioning procedures
D. Status of Change Orders


The contractor is required to replace the lighting fixtures wiht the fixtures specified without
remibursement - CORRECT ANSWER - A contractor under a fixed-price construction
contract has allowed the electrical subcontractor to install lighting fixtures other than those stated
in the contract documents. The electrical subcontractor and the contractor both believe the
substituted fixtures to be of equal value. The construction is substantially completed and the
architect rejects these fixtures. According to AIA Document A201, General Conditions, which of
the following actions must be taken regarding the lighting fixtures?


A. The architect must accept the lighting fixtures as installed without a cost credit to the owner.
B. The architect must accept the lighting fixtures as installed but with a cost credit to the owner.
C. The contractor is required to replace the lighting fixtures with the fixtures specified without
reimbursement.
D. The contractor is required to replace the lighting fixtures specified but is entitled to
reimbursement for labor costs for the replacement.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1053
Member since
1 year
Number of followers
100
Documents
68976
Last sold
3 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reviews

5
72
4
30
3
42
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions