SOLUTIONS RANKED A+
✔✔Orders, Inbasket messages, patients - ✔✔Examples of dynamic records
✔✔Static data, including facility structure, procedures, medications, providers, users,
contact types, forms and form groups - ✔✔What remains in MST after the dynamic data
wipe?
✔✔Manual and automatic build migration - ✔✔To keep MST workflows in sync with TST
and PRD, your organization will use a combination of:
✔✔Analyst or build team - ✔✔Who updates MST manually?
✔✔Data Courier - ✔✔Data migration tool used to move static build from your POC
environment to your TST environment for testing and then to PRD
✔✔To prepare for ways it can change records in your training and be aware of what
data is moving into MST and when - ✔✔As a Principal Trainer, why do you need to
understand how Data Courier works?
✔✔Static data; Dynamic data - ✔✔Data Courier can move _____ but cannot move
_____.
✔✔Training team representatives - ✔✔Who should attend change control meetings?
✔✔Upgrade, Refresh, or Rebuild - ✔✔MST maintenance options
✔✔Upgrade - ✔✔Changing MST to a newer version of Epic
✔✔Refresh - ✔✔Use Data Courier and manual build to bring MST in sync with
production
✔✔Rebuild - ✔✔Erase the existing MST environment, create a new copy of MST from
TST or PRD
✔✔Broken or missing environment configuration. Broken or incorrect patients.
Environment performance issues. - ✔✔MST core problems usually stem from one of
three sources:
✔✔Environment build issue - ✔✔Use Data Courier or manual build to fix application
these issues
, ✔✔Patient build issue - ✔✔Fix problematic patients and re-duplicate if necessary for
these type of issues
✔✔Mitosis performance issue - ✔✔Review and revise Mitosis spreadsheets and Mitosis
start times for these issues
✔✔Severing the link between MST and REF environment but linking one ACE
environment directly to MST - ✔✔Before beginning an upgrade, refresh or rebuild, Epic
recommends:
✔✔Reusability, stability, and safety - ✔✔What are the three main reasons you need a
training environment?
✔✔No, you can apply an upgrade directly to your existing MST build without rebuilding
the entire environment - ✔✔Do you have to totally rebuild MST to apply an upgrade?
✔✔To avoid conflicts, you should only train out of an environment used only for training,
so an ACE. All ACE environments contain the same content, so you can use them
interchangeably. - ✔✔Your organization has a large wave of classes for a specific role
coming up and will be training this role multiple times in a single day. You typically train
out of ACE 3. What other environments could you train out of without disruption?
✔✔During an upgrade, the code in the environment is upgraded, enabling new features
and potentially changing the look and feel of the software to greater or lesser extents.
All of your organization's configuration AND your training build remains afterwards. It
does NOT need to be rebuilt with each upgrade. - ✔✔What happens when your
organization upgrades MST?
✔✔Data Courier will either overwrite your build if the items/master file has not been
locked down by your DC admin or the update will just not come over to MST and is
blocked. - ✔✔You have modified a procedure record in MST to fit the needs of your
training program. Which of the following will happen when your analyst moves a
modification to this procedure from TST to MST again using Data Courier?
✔✔Cookbooks - ✔✔Used as a tool to guide you through the process of training
environment build.
✔✔Training Wheels Application Cookbook - ✔✔Detailed list of application-specific
environment tasks, and steps to complete the tasks.
✔✔Training Coordination Cookbook - ✔✔Detailed list of cross-application environment
build tasks, and steps to complete the tasks and is shared by all PTs on a training team.