Essentials of Building Systems: Design, Operation
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
What are the responsibilities of the design professional during a construction project? -
ansrepresent the owner; advise and consult with the owner; coordinate with other disciplines;
generate a complete set of drawings; coordinate all drawings and specifications; participate in
the bid process and contract selection; verify that workmanship and materials conform to
requirements; periodically inspect the project; prepare punch lists
What are the three traditional principal roles in a construction process? - ansowner, design
professional, and contractor
What is the most vital contribution of the owner during a construction project? - ansproviding
financial resources
The ________ is the project manager unless he or she chooses to delegate or contract out the
responsibility. - ansThe owner is the project manager unless he or she chooses to delegate or
contract out the responsibility.
The ________ prepares the punch lists. - ansThe design professional prepares the punch lists.
It is the responsibility of the ________ to notify the building owner of discrepancies in the
design. - ansIt is the responsibility of the contractor to notify the building owner of
discrepancies in the design.
Responsibilities of the contractor for a construction project include:
a. supplying the project concept and requirements.
b. taking responsibility for all materials and workmanship.
c. providing and arranging the financing. - ansb. taking responsibility for all materials and
workmanship.
Which party in the construction process is responsible for verifying that the workmanship and
materials conform to the requirements of the drawings and specifications?
a. The architect/engineer
b. The owner
c. The building manager - ansa. The architect/engineer
A list of deficiencies in the construction compiled by the project manager or architect near
the end of a job is a:
a. punch list.
b. bid.
c. contract. - ansa. punch list.
The responsibilities of a contractor include all of the following except:
a. generating a complete set of drawings and specifications.
b. giving personal attention to the work.
c. alerting the building owner to discrepancies in the design. - ansa. generating a complete set
of drawings and specifications.
What is the most important responsibility of the owner during the construction process?
a. giving personal attention to the work
b. providing financing
c. following the drawings and specifications - ansb. providing financing
What is speculative development and build-to-suit development? - ansSpeculative
development is when a building is built without a commitment from a user, but with the
belief that a demand exists for the space; build-to-suit development is designing and
constructing a building to meet the specific needs of a user who is committed to a project.
,Essentials of Building Systems: Design, Operation
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
The most challenging and most common construction project in property and facilities
management is:
a.speculative development.
b.build-to-suit development.
c.renovation.
d.energy performance contracting. - ansc.renovation
A ________ can let clients know when they must make decisions about organizational and
project values, goals, and requirements. - ansprogram developer
________ is restoration of a property to satisfactory condition without changing the plan,
form, or style of the structure. - ansRehabilitation
Modernization is conforming the exterior or interior of a property with changes in ________.
- ansstyle
________ is changing the plan, form, or style of a structure to correct functional or economic
deficiencies. - ansRemodeling
When alterations to a primary function area are being performed, which requires that you
remove barriers from the path of travel?
a.BOCA (Building Officials Code Administration)
b.ACLU (American Civil Liberties Union)
c.ADA (Americans with Disabilities Act)
d.UBC (Uniform Building Code) - ansc.ADA (Americans with Disabilities Act)
Most buildings built prior to ________ are excellent candidates for energy performance
contracting and can save at least 15-20 percent on energy bills. - ans1995
All new construction must comply with the standards established in the ________. - ansADA
All of the following are characteristics that should be possessed by people recruited for a
project team except:
a. complimentary skill sets and ample experience.
b. passion for what they are doing and a strong work ethic.
c. a willingness to support the owner regardless of the circumstances. - ansc. a willingness to
support the owner regardless of the circumstances.
Speculative development refers to:
a. a building built without a commitment from a user.
b. design and construction built to suit a specific committed user.
c. changing the plan, form, or design to fit the speculations of an existing user. - ansa. a
building built without a commitment from a user.
Build-to-suit development involves the design and construction of a building to:
a. fulfill the unique specifications of a long-term tenant.
b. meet a specific market demand as identified by an in-depth market study.
c. accommodate the changing space requirements of a growing business. - ansa. fulfill the
unique specifications of a long-term tenant.
Speculative development is a practice that:
a. creates demand.
b. implies uncommitted users.
c. became unpopular in the 1980s. - ansb. implies uncommitted users.
Alterations to buildings must comply with the ADA (Americans with Disabilities Act):
,Essentials of Building Systems: Design, Operation
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
a. in every building regardless of cost and reasonableness.
b. only in public properties.
c. to the maximum extent feasible. - ansc. to the maximum extent feasible.
What are building codes? - ansrules and regulations that promote general safety by regulating
the design and construction of a building's components
A needs assessment is an analysis of the ________ requirements of a specific user. - ansspace
A Program Of Requirements is divided into two sections: the ________ program and the
________ program. - ansfuctional, architectural
A ________ program involves creating written documents that identify the tangible needs a
building must meet. - ansfunctional
The architectural program establishes the size and general character of the proposed building
in a detailed ________ plan. - ansarchitectural
What design phase also is sometimes referred to as sketch design? - ansschematic design
phase
Space utilization standards identify the space needed for all of the following except:
a.window or vision area.
b.job title.
c.function.
d.level within an organization. - ansa.window or vision area.
Which part of the functional program identifies the space needed for each job title, function,
or level within an organization?
a. Space utilization standards
b. Performance criteria
c. Statement of need - ansa. Space utilization standards
Which type of legal control promotes general safety by regulating the design and construction
of a building's components?
a. Zoning variance
b. Zoning codes
c. Building codes - ansc. Building codes
Which type of legal control promotes health, safety, and welfare of the general public by
controlling the use, height, and mass of a building?
a. Zoning variance
b. Zoning codes
c. Building codes - ansb. Zoning codes
The term that best describes the percentage of the lot that can be covered by a structure is:
a. floor area ratio.
b. height limitation.
c. site coverage. - ansc. site coverage.
Which is the best definition of life cycle costing?
a. determining the sum of all the costs associated with an asset
b. projecting the cash flow over the term of proposed permanent financing
c. calculating the payback to determine the desirability of an investment - ansa. determining
the sum of all the costs associated with an asset
, Essentials of Building Systems: Design, Operation
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
What is site coverage, floor area ratio, and easement, or right-of-way? - ansSite coverage is
the amount of land covered by a structure; Floor area ratio is the ratio of the total area of all
the buildings on a lot to the area of a lot; easement or right of way is an agreement that
confers and individual, company, or municipality the right to use a landowner's property in
some way
The two categories of standards are ________ and ________. - ansperformance and
prescriptive
________ standards tell the contractor exactly what to do and how to do it. - ansprescriptive
In which phase of the development process are all design decisions completed?
a.Schematic design phase
b.Bid phase
c.Design development phase
d.Design review phase - ansc. Design development phase
All of the following are included in the design phase except:
a. identifying value engineering opportunities.
b. providing construction schedules.
c. reviewing operating policies and procedures.
d. pre-qualifying subcontractors. - ansc. reviewing operating policies and procedures
________ provide an accurate record of the placement of construction components and the
routing of other components. - ansAs-built drawings
The design development phase of the development process includes all of the following
except:
a. space analysis programming and planning
b. finalizing conceptual design and space planning
c. pre-qualifying subcontractors - ansa. space analysis programming and planning
All of the following should be included as final design documents except:
a. working drawings
b. schematic drawings
c. conditions of the contract - ansb. schematic drawings
All of the following steps are necessary to create complete design and construction contract
documents except:
a. solicit proposals and establish a budget range.
b. conduct monthly progress meetings.
c. monitor work compliance with drawings and specifications. - ansa. solicit proposals and
establish a budget range.
All of the following are disadvantages of selecting a general contractor during the bid phase
of a development process except it:
a. involves the architect in more design documentation than is otherwise needed.
b. delays the general contractor's entry into the development process.
c. removes the chance to process changes in the project and negotiate change orders - ansc.
removes the chance to process changes in the project and negotiate change orders
All of the following are advantages of value engineering except:
a. improving design and constructability.
b. developing better systems at lower overall costs.
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
What are the responsibilities of the design professional during a construction project? -
ansrepresent the owner; advise and consult with the owner; coordinate with other disciplines;
generate a complete set of drawings; coordinate all drawings and specifications; participate in
the bid process and contract selection; verify that workmanship and materials conform to
requirements; periodically inspect the project; prepare punch lists
What are the three traditional principal roles in a construction process? - ansowner, design
professional, and contractor
What is the most vital contribution of the owner during a construction project? - ansproviding
financial resources
The ________ is the project manager unless he or she chooses to delegate or contract out the
responsibility. - ansThe owner is the project manager unless he or she chooses to delegate or
contract out the responsibility.
The ________ prepares the punch lists. - ansThe design professional prepares the punch lists.
It is the responsibility of the ________ to notify the building owner of discrepancies in the
design. - ansIt is the responsibility of the contractor to notify the building owner of
discrepancies in the design.
Responsibilities of the contractor for a construction project include:
a. supplying the project concept and requirements.
b. taking responsibility for all materials and workmanship.
c. providing and arranging the financing. - ansb. taking responsibility for all materials and
workmanship.
Which party in the construction process is responsible for verifying that the workmanship and
materials conform to the requirements of the drawings and specifications?
a. The architect/engineer
b. The owner
c. The building manager - ansa. The architect/engineer
A list of deficiencies in the construction compiled by the project manager or architect near
the end of a job is a:
a. punch list.
b. bid.
c. contract. - ansa. punch list.
The responsibilities of a contractor include all of the following except:
a. generating a complete set of drawings and specifications.
b. giving personal attention to the work.
c. alerting the building owner to discrepancies in the design. - ansa. generating a complete set
of drawings and specifications.
What is the most important responsibility of the owner during the construction process?
a. giving personal attention to the work
b. providing financing
c. following the drawings and specifications - ansb. providing financing
What is speculative development and build-to-suit development? - ansSpeculative
development is when a building is built without a commitment from a user, but with the
belief that a demand exists for the space; build-to-suit development is designing and
constructing a building to meet the specific needs of a user who is committed to a project.
,Essentials of Building Systems: Design, Operation
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
The most challenging and most common construction project in property and facilities
management is:
a.speculative development.
b.build-to-suit development.
c.renovation.
d.energy performance contracting. - ansc.renovation
A ________ can let clients know when they must make decisions about organizational and
project values, goals, and requirements. - ansprogram developer
________ is restoration of a property to satisfactory condition without changing the plan,
form, or style of the structure. - ansRehabilitation
Modernization is conforming the exterior or interior of a property with changes in ________.
- ansstyle
________ is changing the plan, form, or style of a structure to correct functional or economic
deficiencies. - ansRemodeling
When alterations to a primary function area are being performed, which requires that you
remove barriers from the path of travel?
a.BOCA (Building Officials Code Administration)
b.ACLU (American Civil Liberties Union)
c.ADA (Americans with Disabilities Act)
d.UBC (Uniform Building Code) - ansc.ADA (Americans with Disabilities Act)
Most buildings built prior to ________ are excellent candidates for energy performance
contracting and can save at least 15-20 percent on energy bills. - ans1995
All new construction must comply with the standards established in the ________. - ansADA
All of the following are characteristics that should be possessed by people recruited for a
project team except:
a. complimentary skill sets and ample experience.
b. passion for what they are doing and a strong work ethic.
c. a willingness to support the owner regardless of the circumstances. - ansc. a willingness to
support the owner regardless of the circumstances.
Speculative development refers to:
a. a building built without a commitment from a user.
b. design and construction built to suit a specific committed user.
c. changing the plan, form, or design to fit the speculations of an existing user. - ansa. a
building built without a commitment from a user.
Build-to-suit development involves the design and construction of a building to:
a. fulfill the unique specifications of a long-term tenant.
b. meet a specific market demand as identified by an in-depth market study.
c. accommodate the changing space requirements of a growing business. - ansa. fulfill the
unique specifications of a long-term tenant.
Speculative development is a practice that:
a. creates demand.
b. implies uncommitted users.
c. became unpopular in the 1980s. - ansb. implies uncommitted users.
Alterations to buildings must comply with the ADA (Americans with Disabilities Act):
,Essentials of Building Systems: Design, Operation
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
a. in every building regardless of cost and reasonableness.
b. only in public properties.
c. to the maximum extent feasible. - ansc. to the maximum extent feasible.
What are building codes? - ansrules and regulations that promote general safety by regulating
the design and construction of a building's components
A needs assessment is an analysis of the ________ requirements of a specific user. - ansspace
A Program Of Requirements is divided into two sections: the ________ program and the
________ program. - ansfuctional, architectural
A ________ program involves creating written documents that identify the tangible needs a
building must meet. - ansfunctional
The architectural program establishes the size and general character of the proposed building
in a detailed ________ plan. - ansarchitectural
What design phase also is sometimes referred to as sketch design? - ansschematic design
phase
Space utilization standards identify the space needed for all of the following except:
a.window or vision area.
b.job title.
c.function.
d.level within an organization. - ansa.window or vision area.
Which part of the functional program identifies the space needed for each job title, function,
or level within an organization?
a. Space utilization standards
b. Performance criteria
c. Statement of need - ansa. Space utilization standards
Which type of legal control promotes general safety by regulating the design and construction
of a building's components?
a. Zoning variance
b. Zoning codes
c. Building codes - ansc. Building codes
Which type of legal control promotes health, safety, and welfare of the general public by
controlling the use, height, and mass of a building?
a. Zoning variance
b. Zoning codes
c. Building codes - ansb. Zoning codes
The term that best describes the percentage of the lot that can be covered by a structure is:
a. floor area ratio.
b. height limitation.
c. site coverage. - ansc. site coverage.
Which is the best definition of life cycle costing?
a. determining the sum of all the costs associated with an asset
b. projecting the cash flow over the term of proposed permanent financing
c. calculating the payback to determine the desirability of an investment - ansa. determining
the sum of all the costs associated with an asset
, Essentials of Building Systems: Design, Operation
& Maintenance Guide - Part 1.
A Comprehensive Exam Study Guide with 100%
Correct Answers.
Top Score Guaranteed with Grade A+
What is site coverage, floor area ratio, and easement, or right-of-way? - ansSite coverage is
the amount of land covered by a structure; Floor area ratio is the ratio of the total area of all
the buildings on a lot to the area of a lot; easement or right of way is an agreement that
confers and individual, company, or municipality the right to use a landowner's property in
some way
The two categories of standards are ________ and ________. - ansperformance and
prescriptive
________ standards tell the contractor exactly what to do and how to do it. - ansprescriptive
In which phase of the development process are all design decisions completed?
a.Schematic design phase
b.Bid phase
c.Design development phase
d.Design review phase - ansc. Design development phase
All of the following are included in the design phase except:
a. identifying value engineering opportunities.
b. providing construction schedules.
c. reviewing operating policies and procedures.
d. pre-qualifying subcontractors. - ansc. reviewing operating policies and procedures
________ provide an accurate record of the placement of construction components and the
routing of other components. - ansAs-built drawings
The design development phase of the development process includes all of the following
except:
a. space analysis programming and planning
b. finalizing conceptual design and space planning
c. pre-qualifying subcontractors - ansa. space analysis programming and planning
All of the following should be included as final design documents except:
a. working drawings
b. schematic drawings
c. conditions of the contract - ansb. schematic drawings
All of the following steps are necessary to create complete design and construction contract
documents except:
a. solicit proposals and establish a budget range.
b. conduct monthly progress meetings.
c. monitor work compliance with drawings and specifications. - ansa. solicit proposals and
establish a budget range.
All of the following are disadvantages of selecting a general contractor during the bid phase
of a development process except it:
a. involves the architect in more design documentation than is otherwise needed.
b. delays the general contractor's entry into the development process.
c. removes the chance to process changes in the project and negotiate change orders - ansc.
removes the chance to process changes in the project and negotiate change orders
All of the following are advantages of value engineering except:
a. improving design and constructability.
b. developing better systems at lower overall costs.