100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

JMESI - Leadership Four: Project Management Actual questions and answers 100% correct

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
14-06-2025
Written in
2024/2025

Which is one of the triple constraints in project management? • CORRECT ANSWER – Time The project life cycle divides a project into phases to: • CORRECT ANSWER – Provide optimum management and control What element or part of a project management plan details how project decisions and changes are made? • CORRECT ANSWER – Scope definition The preliminary scope statement is part of the: • CORRECT ANSWER – Initiation phase Which project manager activity analyzes contribution, commitment and support? • CORRECT ANSWER – Stakeholder management In addition to managing risks, the other key duty of the project manager is to: • CORRECT ANSWER – Balance the "triple constraints" of quality, time, and cost A risk identification chart identifies and ranks potential risks: • CORRECT ANSWER – By probability, defin impact,

Show more Read less
Institution
JMESI - Leadership Four Project Management
Course
JMESI - Leadership Four Project Management








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
JMESI - Leadership Four Project Management
Course
JMESI - Leadership Four Project Management

Document information

Uploaded on
June 14, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

JMESI - Leadership Four: Project
Management

Which is one of the triple constraints in project management?

• CORRECT ANSWER – Time

The project life cycle divides a project into phases to:

• CORRECT ANSWER – Provide optimum management and control

What element or part of a project management plan details how project decisions and
changes are made?

• CORRECT ANSWER – Scope definition

The preliminary scope statement is part of the:

• CORRECT ANSWER – Initiation phase

Which project manager activity analyzes contribution, commitment and support?

• CORRECT ANSWER – Stakeholder management

In addition to managing risks, the other key duty of the project manager is to:

• CORRECT ANSWER – Balance the "triple constraints" of quality, time, and cost

A risk identification chart identifies and ranks potential risks:

• CORRECT ANSWER – By probability, defin impact, and degree of control

A reason for having a project charter is to:

• CORRECT ANSWER – Obtain approval to proceed with a project and secure
resources

The project life cycle defines which of the following?

• CORRECT ANSWER – What technical work is done in each phase

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PatrickKaylian Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1816
Member since
2 year
Number of followers
1043
Documents
22126
Last sold
1 day ago

3.8

316 reviews

5
147
4
60
3
54
2
15
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions