100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NCCCO Tower Crane (2025/2026) Questions with Correct Answers | Rated A+

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
13-06-2025
Written in
2024/2025

NCCCO Tower Crane (2025/2026) Questions with Correct Answers | Rated A+

Institution
NCCCO
Course
NCCCO










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCCCO
Course
NCCCO

Document information

Uploaded on
June 13, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NCCCO Tower Crane (2025/2026) Questions
with Correct Answers | Rated A+
Splices in rall tracks shall have - CORRECT ANSWER -Smooth Joints



Hydraulic systems should have their proper fluid level checked - CORRECT ANSWER -Daily



If power fails during operations, the following shouldn't apply - CORRECT ANSWER -Do your best
to finish moving load where it was designated to go



If load is undetermined who is to find out if load weight does not exceed crane rating at radius
at which the load is to be lifted - CORRECT ANSWER -Person responsible for lift



Where should climbing instructions be kept - CORRECT ANSWER -ON Site



All climbing operations shall be performed under the supervision of - CORRECT ANSWER -
Qualified person



When cranes are erected, load limiting devices shall be tested for proper setting and operation -
CORRECT ANSWER -Before crane is placed in service



Hooks shall be equipped with latches unless the application makes the use of the latch -
CORRECT ANSWER -Impractical



Size and position of signs or panels must satisfy the limitations of - CORRECT ANSWER -
Manufacturer

,Fall prevention measures are needed for working at locations where you are exposed - CORRECT
ANSWER -To a fall of 6ft or more



Travel distance on hand levers shall not be greater - CORRECT ANSWER -than 14 inches from
neutral position



For power lines rated 175KV the minimum clearance between the lines and any part of the
crane or load is - CORRECT ANSWER -15ft



All controls shall be tested by the operator at the - CORRECT ANSWER -start of new shift



Before each climbing operation all load members of the support system shall be - CORRECT
ANSWER -Inspected



Chain slings are required to be - CORRECT ANSWER -ID tagged



Welding on loads suspended by the crane can only be done if the load has - CORRECT ANSWER -
Insulated slings



How much does an average cubic yard of concrete weight - CORRECT ANSWER -4,000 lbs



Main power switch for tower crane is - CORRECT ANSWER -At base of crane



Items not listed in the frequent inspection checklist are - CORRECT ANSWER -Hydraulic pumps
and valves for excessive wear or damage



When is it necessary to determine that there is no practical alternative way to perform the
needed work or to gain access to the area - CORRECT ANSWER -Personnel Lift

, Each series of voice signals shall contain three elements stated in the following order - CORRECT
ANSWER -Function and Direction - Distance and speed - Function stop



When lifting personnel communication shall be maintained between three of the next four -
CORRECT ANSWER -Person(s) being lifted - Operator - Signal person



The condition when the tower load block or hook assembly comes in contact with the upper -
CORRECT ANSWER -Two-blocking



Load bearing members of the climbing and support system shall be inspected before each -
CORRECT ANSWER -Climbing operation



Where shall a wind velocity indicating device be mounted - CORRECT ANSWER -At or near the
top of crane



A velocity readout shall be provided - CORRECT ANSWER -At the operators station



The area inside the self erecting tower cranes tail swing must be - CORRECT ANSWER -
Barricaded



The self erecting tower crane must be properly grounded according with the - CORRECT
ANSWER -National electric code (NEC)



Self Erecting tower crane erection must be performed by - CORRECT ANSWER -Qualified person



Extensive planning must occur before a self erecting tower crane arrives on the job site. The
plan should be divided into two major sections as follows - CORRECT ANSWER -Delivery, set up,
erection and dismantle - Lifting operations

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AcademicACHIEVER oxford university
View profile
Follow You need to be logged in order to follow users or courses
Sold
250
Member since
1 year
Number of followers
14
Documents
8480
Last sold
2 days ago
A+ Academic achiever

On this page, you find all documents, package deals, and flashcards offered by seller Academic achiever

3.3

56 reviews

5
20
4
7
3
11
2
3
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions