CODEWEST TEST -API 650 & 653 QUESTIONS AND 100% CORRECT ANSWERS 2025/2026
CODEWEST TEST -API 650 & 653 QUESTIONS AND 100% CORRECT ANSWERS 2025/2026 The measurements for internal bottom settlement shall have a maximum of _______ feet spacing between elevation points across the diameter? - Answer -10 completed welds of stress relieved assemblies shall be examined by ____ ,after stress relieving, but before hydrotest - Answer -MT or PT vertical shell joints for new replacement shell plates to existing shell plates or repaired joints in the existing shell plates shall have ____ additional radiograph (s) taken in each joint - Answer -1 the name plate for a reconstructed tank shell have: - Answer -design conditions listed the Min. length of readable RT film a
Written for
- Institution
- Api 653
- Course
- Api 653
Document information
- Uploaded on
- June 9, 2025
- Number of pages
- 3
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
codewest test api 650 653 qa 2025
-
codewest test api 650 653 qa 2026
-
the measurements for internal bottom settlement sh
Also available in package deal