Correct Answers| Latest Update 100% Solved
Which of the following OPTASK LINK sets IS NOT part of the LNKXVI (Link 16 Segment)?
LNKPROT
What information is meant by platform unique data? Geodetic data (position), antenna
height, cable length, and delay
What is required of all participants to initialize a single, synchronized network? Select all that
apply. Same network time
Proper net assignments
Correct crypto loaded
What are the two types of Link 16 networks called? System Time Reference Network and
External Time Reference Network
Which of the following is a purpose of the Network Time Reference (NTR)? Select all that apply.
Transmit an Initial Entry Message (IEM)
Establish network time
What is required for a Link 16 terminal to obtain coarse synchronization? Reception of one
error free J0.0 Initial Entry Message (IEM)
What is required for a Link 16 terminal to PASSIVELY obtain fine synchronization? Reception
of three PPLI messages from the three different source
Which of the following IS NOT true about an NTRE in an External Time Reference Network
(ETRN)? Will always have a time quality (QT) of 15
, Which of the following IS NOT responsible for the Link 16 network maintenance functions?
Grid Reference Unit
Subscriber functions are the actions, other than maintenance, that are required to maintain
Link 16 network operations and include _______________, platform indicators, and Network
Participation Status, or NPS. Platform indicators
A ____________ will use RTT exchanges to maintain and improve synchronization. Primary
User (PRU)
Which of the following IS NOT a terminal interrupt? Relay Delay
Correctly choose the data registration process and its description
a)Process in which a JTIDS/MIDS Unit (JU) monitors and adjusts positional data with
information derived through Relative Navigation (RELNAV).
b)Compares local data to tracks received from a selected IU and applies corrective values to
positional data received from that IU.
c)Process that corrects alignment of the sensor elements used for the measurement of a
tracked object's position. a. Geodetic Registration
b. Remote IU Registration
c. Sensor Registration
Which statement/statements regarding PPLI processing is accurate? Geometry and time
within the link will improve position quality