100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU C720 Competency 6: Operating Efficiency Question and answers correctly solved 2025

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
08-06-2025
Written in
2024/2025

WGU C720 Competency 6: Operating Efficiency Question and answers correctly solved 2025 Just-in-time (JIT) - correct answer manufacturing methodology aimed primarily at reducing flow times within production systems as well as response times from suppliers and to customers by receiving ordering and receiving inventory when ready for use or just in time for use What are the fundamental concepts of JIT? - correct answer - JIT allows materials to flow in an assembly process similar to a continuous flow process - uses general purpose machinery - produces in small batches or small lot sizes - uses a pull system - uses process facility layout

Show more Read less
Institution
WGU C720 Competency 6: Operating Efficiency
Course
WGU C720 Competency 6: Operating Efficiency








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU C720 Competency 6: Operating Efficiency
Course
WGU C720 Competency 6: Operating Efficiency

Document information

Uploaded on
June 8, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

WGU C720 Competency 6: Operating
Efficiency Question and answers
correctly solved 2025
Just-in-time (JIT) - correct answer ✔manufacturing methodology aimed
primarily at reducing flow times within production systems as well as response
times from suppliers and to customers by receiving ordering and receiving
inventory when ready for use or just in time for use


What are the fundamental concepts of JIT? - correct answer ✔- JIT allows
materials to flow in an assembly process similar to a continuous flow process
- uses general purpose machinery
- produces in small batches or small lot sizes
- uses a pull system
- uses process facility layout


Just-in-Time 2 (JIT II) - correct answer ✔relationships with suppliers are
further strengthened beyond vendor managed inventory in which the supplier
places a representative on the customer's site that is dedicated to the
customers products only


Push System - correct answer ✔moves materials through the process
operations based on a schedule


Pull System - correct answer ✔moves materials through a system to work-
stations as they are needed

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Academia199 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
350
Member since
3 year
Number of followers
208
Documents
18964
Last sold
1 day ago

3.9

50 reviews

5
27
4
6
3
7
2
3
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions