ICC California UST ServiceTechnician
| | | |
Study |online |at |https://quizlet.com/_eyij01
1. UDC was required at time of installation for all sys-
| | | | | | | | | January 1, 2000 | |
tems installed after?
| | |
2. July 1, 2005, service techs shall possess or work
| | | | | | | | ICC UST Service | |
under someone who has a current certification indi-
| | | | | | | | Technician Exam
| |
cating he or she has passed the?
| | | | | | |
3. ICC cert must be renewed every?
| | | | | 24 months
|
4. Service techs must possess or be employed by a
| | | | | | | | The individual has | |
person who has the appropriate contractor's license
| | | | | | | a tank testing li-
| | | |
unless?
| cense
|
5. Service tech is defined by any individual who?
| | | | | | | Tests UST moni- | |
toringequipment, |
trouble shoots
| |
UST systems,
| |
and/or installs
| |
UST monitoring
| |
equipment.
|
6. If the manufacturer training no longer exist, the local
| | | | | | | | Approve compara- |
agency may?
| | ble alternate train-
| | |
ing .
| |
7. UST includes?
| Tank and connect- | |
ed piping
|
8. What is considered a UST?
| | | | A petroleum stor-
| |
age tank.
| |
9. What UST system meets the requirements for sec-
| | | | | | | Doubled wall |
ondary containment?
| | tanks
|
10. According to title 23; the following piping compo- | | | | | | | Pressured product |
nents if installed after July 1, 1987 must have sec-
| | | | | | | | | | piping
|
ondary containment.
| |
11. Considered "pipe" on tanks installed after July 1, | | | | | | | Pressured product |
2003.
| piping and below
| | |
1 |/ |26
, ICC California UST ServiceTechnician
| | | |
Study |online |at |https://quizlet.com/_eyij01
groundvapor re- | |
covery.
|
12. Under dispenser containment (UDC) was required for
| | | | | | December 31, |
all existing UST systems by
| | | | | 2003
13. System for exchanging gas vapors in a storage tank
| | | | | | | | Stage 1 vapor re- | | |
and product in a fuel delivery truck
| | | | | | | covery
|
14. An approved method for non-visual monitoring for
| | | | | | Statistical Invento- |
existing UST systems.
| | | ry Reconciliation
| |
(SIR)
|
15. ATG must be capable for detecting a release of?
| | | | | | | | 0.2 gallons per | |
hour
16. Whatis no longer anapproved method for non-visual
| | | | | | | | Manualinventory |
monitoring on existing UST systems?
| | | | | reconciliation.
|
17. Automatic line leak detectors installed on under- | | | | | | 3 gallons per hour
| | |
ground piping with secondary containment shall be
| | | | | | | at 10 psi
| | |
capable of detecting a leak of ?
| | | | | | |
18. How often should ATG be programmed to test the
| | | | | | | | At least monthly
| |
tank?
|
19. According to PEI RP 300, a combustible gas can be | | | | | | | | | Detect vaporleaks | |
used to?
| | in a vapor recov-
| | | |
ery system.
| |
20. According to PEI RP 300, a written scope of work for | | | | | | | | | | Construction
vapor recovery installation should include?
| | | | | plans
|
21. Positive shut off overfill protection device must stop
| | | | | | | 95% full |
the flow of fuel when the tank is no more then?
| | | | | | | | | | |
22. According to Executive Order (EO) VR 201-A , what | | | | | | | | Depended filter |
could cause a nozzle shutoff mechanism or malfunc-
| | | | | | | | | seal damage
| |
tion?
|
2 |/ |26
, ICC California UST ServiceTechnician
| | | |
Study |online |at |https://quizlet.com/_eyij01
23. According toVR 201-A, breakaway reconnection | | | | | Logged in GDF log | | |
must be?
| |
Sketching a dia- | |
24. According to PEI RP 300 what is an INCORRECT | | | | | | | | gramon the inside
| | | |
method of documenting piping location?
| | | | | cover of vapor re-
| | | |
covery equipment
| |
manual
|
maintained as |
25. According to PEI RP 300 as built drawing or pictures of long as UST is in
| | | | | | | | | | | | | | |
the underground pipping and other components
| | service. | | | | |
shall be
| . |
Name and Desig- | |
26. According to EOVR 101-E maintenance records are nated UST Opera-
| | | | | | | | | |
required to include what?
| | tor. | | |
Used with no more | | |
27. The Phil-Tite EVR Phase 1 system require that vapor
| | | | | | | | than 3 p/v valves
| | | |
vent pipes at any UST system be
| | | | | | |
Nozzle dispensing |
28. According to EOVR 2010 after installing a new spout | | | | | | | | | shut off test
| | |
assembly in the Healy 900 nozzle the following test
| | | | | | | | |
must be conducted?
| | |
Gasolinedispens- |
29. According to Healy EOVR 201-A a vapor recovery | | | | | | | | ing facility opera-
| | |
record is to be maintained by?
| | | | | | tor(GDF)
|
1000 feet |
30. An enhanced leak detection test is required within
| | | | | | |
how many feet of a public drinking well?
| | | | | | | |
31. What are the components of the FireTriangle?
| | | | | | | Fuel, Heat/Ignition |
Source, Oxygen |
32. If equipped with an over fill alarm,it must be located? So it can be seen
| | | | | | | | | | | | | | |
or heard from the | | |
delivery location. | |
33. Automatic Tank |
Gauge, Liquid |
3 |/ |26
| | | |
Study |online |at |https://quizlet.com/_eyij01
1. UDC was required at time of installation for all sys-
| | | | | | | | | January 1, 2000 | |
tems installed after?
| | |
2. July 1, 2005, service techs shall possess or work
| | | | | | | | ICC UST Service | |
under someone who has a current certification indi-
| | | | | | | | Technician Exam
| |
cating he or she has passed the?
| | | | | | |
3. ICC cert must be renewed every?
| | | | | 24 months
|
4. Service techs must possess or be employed by a
| | | | | | | | The individual has | |
person who has the appropriate contractor's license
| | | | | | | a tank testing li-
| | | |
unless?
| cense
|
5. Service tech is defined by any individual who?
| | | | | | | Tests UST moni- | |
toringequipment, |
trouble shoots
| |
UST systems,
| |
and/or installs
| |
UST monitoring
| |
equipment.
|
6. If the manufacturer training no longer exist, the local
| | | | | | | | Approve compara- |
agency may?
| | ble alternate train-
| | |
ing .
| |
7. UST includes?
| Tank and connect- | |
ed piping
|
8. What is considered a UST?
| | | | A petroleum stor-
| |
age tank.
| |
9. What UST system meets the requirements for sec-
| | | | | | | Doubled wall |
ondary containment?
| | tanks
|
10. According to title 23; the following piping compo- | | | | | | | Pressured product |
nents if installed after July 1, 1987 must have sec-
| | | | | | | | | | piping
|
ondary containment.
| |
11. Considered "pipe" on tanks installed after July 1, | | | | | | | Pressured product |
2003.
| piping and below
| | |
1 |/ |26
, ICC California UST ServiceTechnician
| | | |
Study |online |at |https://quizlet.com/_eyij01
groundvapor re- | |
covery.
|
12. Under dispenser containment (UDC) was required for
| | | | | | December 31, |
all existing UST systems by
| | | | | 2003
13. System for exchanging gas vapors in a storage tank
| | | | | | | | Stage 1 vapor re- | | |
and product in a fuel delivery truck
| | | | | | | covery
|
14. An approved method for non-visual monitoring for
| | | | | | Statistical Invento- |
existing UST systems.
| | | ry Reconciliation
| |
(SIR)
|
15. ATG must be capable for detecting a release of?
| | | | | | | | 0.2 gallons per | |
hour
16. Whatis no longer anapproved method for non-visual
| | | | | | | | Manualinventory |
monitoring on existing UST systems?
| | | | | reconciliation.
|
17. Automatic line leak detectors installed on under- | | | | | | 3 gallons per hour
| | |
ground piping with secondary containment shall be
| | | | | | | at 10 psi
| | |
capable of detecting a leak of ?
| | | | | | |
18. How often should ATG be programmed to test the
| | | | | | | | At least monthly
| |
tank?
|
19. According to PEI RP 300, a combustible gas can be | | | | | | | | | Detect vaporleaks | |
used to?
| | in a vapor recov-
| | | |
ery system.
| |
20. According to PEI RP 300, a written scope of work for | | | | | | | | | | Construction
vapor recovery installation should include?
| | | | | plans
|
21. Positive shut off overfill protection device must stop
| | | | | | | 95% full |
the flow of fuel when the tank is no more then?
| | | | | | | | | | |
22. According to Executive Order (EO) VR 201-A , what | | | | | | | | Depended filter |
could cause a nozzle shutoff mechanism or malfunc-
| | | | | | | | | seal damage
| |
tion?
|
2 |/ |26
, ICC California UST ServiceTechnician
| | | |
Study |online |at |https://quizlet.com/_eyij01
23. According toVR 201-A, breakaway reconnection | | | | | Logged in GDF log | | |
must be?
| |
Sketching a dia- | |
24. According to PEI RP 300 what is an INCORRECT | | | | | | | | gramon the inside
| | | |
method of documenting piping location?
| | | | | cover of vapor re-
| | | |
covery equipment
| |
manual
|
maintained as |
25. According to PEI RP 300 as built drawing or pictures of long as UST is in
| | | | | | | | | | | | | | |
the underground pipping and other components
| | service. | | | | |
shall be
| . |
Name and Desig- | |
26. According to EOVR 101-E maintenance records are nated UST Opera-
| | | | | | | | | |
required to include what?
| | tor. | | |
Used with no more | | |
27. The Phil-Tite EVR Phase 1 system require that vapor
| | | | | | | | than 3 p/v valves
| | | |
vent pipes at any UST system be
| | | | | | |
Nozzle dispensing |
28. According to EOVR 2010 after installing a new spout | | | | | | | | | shut off test
| | |
assembly in the Healy 900 nozzle the following test
| | | | | | | | |
must be conducted?
| | |
Gasolinedispens- |
29. According to Healy EOVR 201-A a vapor recovery | | | | | | | | ing facility opera-
| | |
record is to be maintained by?
| | | | | | tor(GDF)
|
1000 feet |
30. An enhanced leak detection test is required within
| | | | | | |
how many feet of a public drinking well?
| | | | | | | |
31. What are the components of the FireTriangle?
| | | | | | | Fuel, Heat/Ignition |
Source, Oxygen |
32. If equipped with an over fill alarm,it must be located? So it can be seen
| | | | | | | | | | | | | | |
or heard from the | | |
delivery location. | |
33. Automatic Tank |
Gauge, Liquid |
3 |/ |26