The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ - CORRECT ANSWERS.️️Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that are - CORRECT ANSWERS.️️greater than or equal to an acre The Stormwater Management Act requires the State Water Control Board to - CORRECT ANSWERS.️️permit, regulate, and control stormwater runoff DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts upon request - CORRECT ANSWERS.️️90 The Stormwater Management Act requires the following individuals to obtain and maintain a certificate of competency - CORRECT ANSWERS.️️staff of a stormwater program, anyone contracted by a VSMP authority, standard and specification holders The dual certificate will expire three years from - CORRECT ANSWERS.️️the latest date of the certificates SWM plan must be approved by ___ before land disturbance - CORRECT ANSWERS.️️VSMP program authority The water quality criteria sets a site-based load limit of ____ of total phosphorus for new development - CORRECT ANSWERS.️️0.41 lbs/acre/year The phosphorus load limit uses the - CORRECT ANSWERS.️️10% impervious cover Part II B and II C water quantity criteria addresses - CORRECT ANSWERS.️️channel protection and flood protection Which two plans in the SWPPP must be approved? - CORRECT ANSWERS.️️SWM plan, ESC plan Does the SWM plan address runoff during or after construction? - CORRECT ANSWERS.️️post-construction What is the lower limit of the range of imperviousness that can result in stream degradation? - CORRECT ANSWERS.️️10% What do land disturbing activities consist of? - CORRECT ANSWERS.️️excavating, clearing, grading LDA threshold for the SWM Act and Regulation - CORRECT ANSWERS.️️1 acre or 2500 square feet for Chesapeake Bay Preservation Act In situations where an initial exemption was applicable because LDAs were related to emergency work, VSMP authority shall be advised of the disturbance within - CORRECT ANSWERS.️️7 days of commencing the LDA and shall submit a permit application within 30 days of starting the land-disturbing activity Localities with MS4 - CORRECT ANSWERS.️️must adopt and administer a stormwater program Localities without MS4 - CORRECT ANSWERS.️️may choose to administer a VSMP or have DEQ administer the program DEQ is responsible for enforcing the ____ while locality ____ are responsible for enforcing local ordinances - CORRECT ANSWERS.️️Construction GP, VSMP A locality VSMP authority must include enforcement authority and a schedule of civil penalties for enforcement actions in its local ordinance. The maximum penalty the authority may issue is - CORRECT ANSWERS.️️$32,500 per violation per day

Show more Read less
Institution
SWM DEQ
Course
SWM DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
June 3, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

STUDYSAGE



SWM DEQ EXAM|COMPLETE STUDY
GUIDE WITH DETAILED QUESTIONS
AND 100% RIGHT/VERIFIED
ANSWERS|GUARANTEED A PASS|
LATEST UPDATED VERSION 2025.
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - CORRECT ANSWERS.✔️✔️Virginia Stormwater
Management Act, Virginia Stormwater Management Program Regulation


VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - CORRECT ANSWERS.✔️✔️greater than or equal
to an acre


The Stormwater Management Act requires the State Water Control Board to -
CORRECT ANSWERS.✔️✔p ️ ermit, regulate, and control stormwater runoff


DEQ has ___ days to complete review of real or potential inter-jurisdictional
impacts upon request - CORRECT ANSWERS.✔️✔️90


The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - CORRECT ANSWERS.✔️✔️staff of a
stormwater program, anyone contracted by a VSMP authority, standard and
specification holders


The dual certificate will expire three years from - CORRECT ANSWERS.✔️✔️the
latest date of the certificates




SUCCESS

, STUDYSAGE


SWM plan must be approved by ___ before land disturbance - CORRECT
ANSWERS.✔️✔️VSMP program authority


The water quality criteria sets a site-based load limit of ____ of total phosphorus
for new development - CORRECT ANSWERS.✔️✔️0.41 lbs/acre/year


The phosphorus load limit uses the - CORRECT ANSWERS.✔️✔️10% impervious
cover


Part II B and II C water quantity criteria addresses - CORRECT
ANSWERS.✔️✔️channel protection and flood protection


Which two plans in the SWPPP must be approved? - CORRECT
ANSWERS.✔️✔️SWM plan, ESC plan


Does the SWM plan address runoff during or after construction? - CORRECT
ANSWERS.✔️✔p ️ ost-construction


What is the lower limit of the range of imperviousness that can result in stream
degradation? - CORRECT ANSWERS.✔️✔️10%


What do land disturbing activities consist of? - CORRECT
ANSWERS.✔️✔e️ xcavating, clearing, grading


LDA threshold for the SWM Act and Regulation - CORRECT ANSWERS.✔️✔️1 acre
or 2500 square feet for Chesapeake Bay Preservation Act




SUCCESS
$14.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
STUDYSAGE

Get to know the seller

Seller avatar
STUDYSAGE Yale University
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
1 year
Number of followers
0
Documents
1049
Last sold
6 months ago
SELLING NOTES ONLINE,,GET ALL YOUR STUDY MATERIALS,QUALITY DOCUMENTS FOR BETTER RESULTS

Welcome to my online store, where I offer a variety of high-quality study documents designed to help students excel in their studies. Whether you need notes, summaries, or exam preparation materials, you'll find resources tailored to different subjects and learning styles. My goal is to support your academic journey by providing accessible and effective study aids." offer a variety of high-quality study documents designed to help students excel in their studies. Whether you need notes, summaries, or exam preparation materials, you'll find resources tailored to different subjects and learning styles. My goal is to support your academic journey by providing accessible and effective study aids."

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions