Oregon Construction Contractors CCB
Test 2025 Questions and Answers
A person who engages in a business or activity that involves construction new water wells must
possess a license from the: - ANSWER✔✔-Oregon Water Resource Department (OWRD)
True or False
Prompt billing and prompt collections make for a healthier cash flow. - ANSWER✔✔-True
Oregon OSHA consultants WILL NOT: - ANSWER✔✔-Issue citations or propose penalties for
violations of OSHA standards.
1) Questions to answer when preparing your project schedule include all of these except:
- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity? - ANSWER✔✔-- All of these are
questions to ask
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 1
,- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity?
For Notice of Right Lien purpose, a commercial improvement is defined as: - ANSWER✔✔-A
structure that is not used or intended for use as a residential building
I am the residential original contractor and I provide labor and materials for the project. Who do I
need to give a notice of Right to Lien to? - ANSWER✔✔-Mortgagee
A quantity survey is also referred to as a: - ANSWER✔✔-Take Off
Tagout involves placing a warning tag: - ANSWER✔✔-On an energy-isolation device
Other than Take Off, other common construction estimate types include all, except: -
ANSWER✔✔-Ballpark Estimates
True or False
An on-site of host employer is responsible for ensuring a safe place of employment for leased or
temporary workers. - ANSWER✔✔-True
The state unemployment tax rate varies base on: - ANSWER✔✔-The history of unemployment
claims against the employer.
Stop work order violations can result in: - ANSWER✔✔-- Any of these could be the result of
failure to comply with a stop work order.
- Court action
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 2
,- Permit or license revocation
- Civil penalties
The ___________________ gives an overview of the project, deadlines, and general requirements. -
ANSWER✔✔-Invitation to Bid
"Job Logic" refers to: - ANSWER✔✔-The sequence of work
True or False
Self-employment taxes apply to all forms of business entities. - ANSWER✔✔-False
- Money earned and money spent are accounted for in the year they are received or paid,
respectively. - ANSWER✔✔-In the Cash Method
The Itemized Summary is the basis for: - ANSWER✔✔-A complete and accurate estimate of
project costs and lists all major items of work in the order they are to be performed.
A major difference between the EIN and the BIN is: - ANSWER✔✔-One is federal and one is state
Poor construction and storage practices can result in _________________ inside the structure
walls. - ANSWER✔✔-Molds and fungus
Builders now must use corrosion-resistance flashing in these specified locations, except: -
ANSWER✔✔-Surrounding all interior bedroom doors.
Compliance with environmental regulations can protect a contractor from:
- All of these are correct
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 3
, - Private party lawsuits
- Criminal and civil penalties
- Liability claims - ANSWER✔✔-- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims
Using the Quantity Take-Off method for estimating, you begin by estimating the cost of
_________________ for each individual task. - ANSWER✔✔-Labor and materials
Contractors must apply for permits through: - ANSWER✔✔-Their local building department
A cost effective method for managing material costs and keeping inventory costs down is the: -
ANSWER✔✔-JIT - Just In Time
These are materials prohibited form open burning in Oregon except for: - ANSWER✔✔-Unpainted
and untreated scrap wood
An owner-seller may comply with the Homebuyers Protection Act (HPA) by:
- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow - ANSWER✔✔-- Doing any of these
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 4
Test 2025 Questions and Answers
A person who engages in a business or activity that involves construction new water wells must
possess a license from the: - ANSWER✔✔-Oregon Water Resource Department (OWRD)
True or False
Prompt billing and prompt collections make for a healthier cash flow. - ANSWER✔✔-True
Oregon OSHA consultants WILL NOT: - ANSWER✔✔-Issue citations or propose penalties for
violations of OSHA standards.
1) Questions to answer when preparing your project schedule include all of these except:
- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity? - ANSWER✔✔-- All of these are
questions to ask
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 1
,- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity?
For Notice of Right Lien purpose, a commercial improvement is defined as: - ANSWER✔✔-A
structure that is not used or intended for use as a residential building
I am the residential original contractor and I provide labor and materials for the project. Who do I
need to give a notice of Right to Lien to? - ANSWER✔✔-Mortgagee
A quantity survey is also referred to as a: - ANSWER✔✔-Take Off
Tagout involves placing a warning tag: - ANSWER✔✔-On an energy-isolation device
Other than Take Off, other common construction estimate types include all, except: -
ANSWER✔✔-Ballpark Estimates
True or False
An on-site of host employer is responsible for ensuring a safe place of employment for leased or
temporary workers. - ANSWER✔✔-True
The state unemployment tax rate varies base on: - ANSWER✔✔-The history of unemployment
claims against the employer.
Stop work order violations can result in: - ANSWER✔✔-- Any of these could be the result of
failure to comply with a stop work order.
- Court action
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 2
,- Permit or license revocation
- Civil penalties
The ___________________ gives an overview of the project, deadlines, and general requirements. -
ANSWER✔✔-Invitation to Bid
"Job Logic" refers to: - ANSWER✔✔-The sequence of work
True or False
Self-employment taxes apply to all forms of business entities. - ANSWER✔✔-False
- Money earned and money spent are accounted for in the year they are received or paid,
respectively. - ANSWER✔✔-In the Cash Method
The Itemized Summary is the basis for: - ANSWER✔✔-A complete and accurate estimate of
project costs and lists all major items of work in the order they are to be performed.
A major difference between the EIN and the BIN is: - ANSWER✔✔-One is federal and one is state
Poor construction and storage practices can result in _________________ inside the structure
walls. - ANSWER✔✔-Molds and fungus
Builders now must use corrosion-resistance flashing in these specified locations, except: -
ANSWER✔✔-Surrounding all interior bedroom doors.
Compliance with environmental regulations can protect a contractor from:
- All of these are correct
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 3
, - Private party lawsuits
- Criminal and civil penalties
- Liability claims - ANSWER✔✔-- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims
Using the Quantity Take-Off method for estimating, you begin by estimating the cost of
_________________ for each individual task. - ANSWER✔✔-Labor and materials
Contractors must apply for permits through: - ANSWER✔✔-Their local building department
A cost effective method for managing material costs and keeping inventory costs down is the: -
ANSWER✔✔-JIT - Just In Time
These are materials prohibited form open burning in Oregon except for: - ANSWER✔✔-Unpainted
and untreated scrap wood
An owner-seller may comply with the Homebuyers Protection Act (HPA) by:
- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow - ANSWER✔✔-- Doing any of these
FOR STUDY PURPOSES ONLY COPYRIGHT © 2025 ALL RIGHTS RESERVED 4