GE101: Introduction to General Engineering - 🧠ANSWER ✔✔· Purpose of
GE Module: Develop officers with ability to plan and generate General
Engineering effects in support of the maneuver commander during ULO
· Definition of GE: Those engineering capabilities and activities other than
combat engineering that modify, maintain, or protect the physical
environment.
· GE is utilized in support of: - 🧠ANSWER ✔✔o Defense- Continuously
conducted to harden and prepare positions, facilities, installations
o Offense- Providing assured mobility of forces from ports of debarkation to
forward AOs
o Stability- Focus is likely GE capabilities applied to restore essential
services and support infrastructure development
Geospatial - 🧠ANSWER ✔✔supports vertical and horizontal construction
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
1
,GE104: Engineer Reconnaissance - 🧠ANSWER ✔✔· Engineer
Reconnaissance Is NOT a FORM of reconnaissance. The forms are route,
zone, area, reconnaissance in force, and special.
· USACE Contingency Elements (UCE): Forward Support Team Advance
(FEST-A), Reconnaissance Team (RT), Advanced Echelon (ADVON)
Team, Contingency Engineer District (CED).
· Technical Reconnaissance vs. Tactical Reconnaissance
GE105: Planning Construction Operations - 🧠ANSWER ✔✔Projects come
from requestor (unit or installation entity) identifies a need which can be
met by engineer support
MDMP in Construction Planning 1 of 2 - 🧠ANSWER ✔✔o MDMP Step 1:
Receive Mission-> Understand what you actually need to do. Gather tools,
time analysis, higher intent, shortfalls, Excess. Do not overlook geospatial.
o MDMP Step 2: Mission Analysis-> Compile analysis into one effort.
Involve BDE S2 Geospatial cell
MDMP in Construction Planning 2 of 2 - 🧠ANSWER ✔✔o MDMP Step 3-6:
COA development, COA analysis, COA comparison, COA approval
o MDMP Step 7: Rehearsals
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
2
, Real Estate - 🧠ANSWER ✔✔The overall collection of property
When planning construction operations also account for...? - 🧠ANSWER
✔✔· Protection Considerations, Sustainment Considerations...
MDMP COA development produces what? - 🧠ANSWER ✔✔· different
designs to meet the commander's intent.
GE107: Project Management - 🧠ANSWER ✔✔Is application of knowledge,
skills, and resources to accomplish activities that are intended to achieve a
specific goal.
· A project will: - 🧠ANSWER ✔✔o Not be part of ongoing day to day
business.
o Involve notable risk.
o Be significantly impacted upon failure of activities.
Have at least 2 people or elements working together
Project Components - 🧠ANSWER ✔✔o Time- Time to complete the project
as reflected in your project schedule.
o Money- Project budget based on cost of the resources.
Scope- Goals and tasks of project and work required to complete them
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
3
Questions and Correct Answers | New
Update
GE101: Introduction to General Engineering - 🧠ANSWER ✔✔· Purpose of
GE Module: Develop officers with ability to plan and generate General
Engineering effects in support of the maneuver commander during ULO
· Definition of GE: Those engineering capabilities and activities other than
combat engineering that modify, maintain, or protect the physical
environment.
· GE is utilized in support of: - 🧠ANSWER ✔✔o Defense- Continuously
conducted to harden and prepare positions, facilities, installations
o Offense- Providing assured mobility of forces from ports of debarkation to
forward AOs
o Stability- Focus is likely GE capabilities applied to restore essential
services and support infrastructure development
Geospatial - 🧠ANSWER ✔✔supports vertical and horizontal construction
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
1
,GE104: Engineer Reconnaissance - 🧠ANSWER ✔✔· Engineer
Reconnaissance Is NOT a FORM of reconnaissance. The forms are route,
zone, area, reconnaissance in force, and special.
· USACE Contingency Elements (UCE): Forward Support Team Advance
(FEST-A), Reconnaissance Team (RT), Advanced Echelon (ADVON)
Team, Contingency Engineer District (CED).
· Technical Reconnaissance vs. Tactical Reconnaissance
GE105: Planning Construction Operations - 🧠ANSWER ✔✔Projects come
from requestor (unit or installation entity) identifies a need which can be
met by engineer support
MDMP in Construction Planning 1 of 2 - 🧠ANSWER ✔✔o MDMP Step 1:
Receive Mission-> Understand what you actually need to do. Gather tools,
time analysis, higher intent, shortfalls, Excess. Do not overlook geospatial.
o MDMP Step 2: Mission Analysis-> Compile analysis into one effort.
Involve BDE S2 Geospatial cell
MDMP in Construction Planning 2 of 2 - 🧠ANSWER ✔✔o MDMP Step 3-6:
COA development, COA analysis, COA comparison, COA approval
o MDMP Step 7: Rehearsals
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
2
, Real Estate - 🧠ANSWER ✔✔The overall collection of property
When planning construction operations also account for...? - 🧠ANSWER
✔✔· Protection Considerations, Sustainment Considerations...
MDMP COA development produces what? - 🧠ANSWER ✔✔· different
designs to meet the commander's intent.
GE107: Project Management - 🧠ANSWER ✔✔Is application of knowledge,
skills, and resources to accomplish activities that are intended to achieve a
specific goal.
· A project will: - 🧠ANSWER ✔✔o Not be part of ongoing day to day
business.
o Involve notable risk.
o Be significantly impacted upon failure of activities.
Have at least 2 people or elements working together
Project Components - 🧠ANSWER ✔✔o Time- Time to complete the project
as reflected in your project schedule.
o Money- Project budget based on cost of the resources.
Scope- Goals and tasks of project and work required to complete them