100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ERC Certification End-Term Exam– A+ Graded Submission – 100- Verified Q&A for Success

Rating
-
Sold
-
Pages
24
Grade
A+
Uploaded on
29-05-2025
Written in
2024/2025

ERC Certification End-Term Exam– A+ Graded Submission – 100- Verified Q&A for Success

Institution
NERC
Course
NERC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
May 29, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC Certification End-Term Exam– A+ Graded
Submission – 100% Verified Q&A for Success
If the MSSC for a BA is 800 MW, what is the DCS reporting threshold?



A) 240 MW



B) 640 MW



C) 840 MW



D) 300 MW - ✔✔B) 640 MW (80 %)



A BA that is part of a multiple BA Interconnection that is not receiving overlap regulation and uses a
fixed Frequency Bias Setting must have its calculated setting validated by the - ✔✔ERO (Electric
Reliability Organization)



The Frequency Bias Setting for a Balancing Area must be expressed in?



A) MW/0.1 Hz



B) MW/0.5 Hz



C) MW/0.01 Hz



D) MW/0.05 Hz - ✔✔A) MW/0.1 Hz



Units with nameplate ratings of _____ or greater should be equipped with governors.

,A) 25 MW



B) 15 MW



C) 10 MW



D) 50 MW - ✔✔C) 10 MW



There are how many ways to make adjustments for a time error correction?



A) 2



B) 3



C) 5



D) 6 - ✔✔A) 2



Who can serve as an Interconnection Time Monitor? - ✔✔Only Reliability Coordinators



BAs use ______ to automatically direct the loading of regulating reserves on their system. - ✔✔AGC
(Automatic Generation Control)



The MSSC for your BA is 650 MW. Your reporting threshold is > 520 MW. (650 x 80%). What is the
percent of recovery for the following situation?



Loss of a 575 MW unit

Pre-disturbance Ace = 150 MW

Post-recovery Ace = 10 MW - ✔✔+150 + (-575) = -425

, -425 + (x) = 10, x= 435



435/425= 100%



The MSSC for your BA is 650 MW. Your reporting threshold is >/equal to 520 MW. (650 x 80%) What is
the percent of recovery for the following situation?



Loss of a 600 MW unit

Pre-disturbance Ace = 150 MW

Post-recovery Ace = -50MW - ✔✔+150 + (-600) = -450



-450 + (x) = -50, x= 400



400/450= 89%



Units with nameplate ratings of 10 MW or greater should be equipped with governors which have a
droop of ______% - ✔✔5%,



All of the reasons listed below can be a cause of inadvertent accumulation except - ✔✔Market response



Each Balancing Area shall operate its AGC on ______, unless such operation is adverse to system or
Interconnection reliability. - ✔✔Tie-Line Frequency Bias



If a BA is unable to calculate ACE for more than _________ it shall notify its RC - ✔✔30 minutes



As a minimum, the BA must provide its System Operators with real-time values for all of the following
except ______ with each adjacent BA. - ✔✔MVAR flows
$7.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
InsightPapers

Get to know the seller

Seller avatar
InsightPapers Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
4
Member since
10 months
Number of followers
0
Documents
489
Last sold
2 days ago
edutech papers shop selling study exams elaborations :

High-quality exams and answers, summaries, exam guides, and practice questions created for top-performing students. Perfect for boosting your grades and preparing efficiently—organized by course and institution.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions