100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

FDOT Earthwork Level 1 | update|COMPLETE MOST TESTED QUESTIONS AND VERIFIED ANSWERS (100% Correct solutions)| GET IT RIGHT!! | ALREADY GRADED A+

Rating
-
Sold
1
Pages
16
Grade
A+
Uploaded on
28-05-2025
Written in
2024/2025

FDOT Earthwork Level 1 | update|COMPLETE MOST TESTED QUESTIONS AND VERIFIED ANSWERS (100% Correct solutions)| GET IT RIGHT!! | ALREADY GRADED A+

Institution
FDOT Earthwork Level 1
Course
FDOT Earthwork Level 1










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT Earthwork Level 1
Course
FDOT Earthwork Level 1

Document information

Uploaded on
May 28, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT Earthwork Level 1 |
update|COMPLETE MOST TESTED
QUESTIONS AND VERIFIED
ANSWERS (100% Correct solutions)|
GET IT RIGHT!! | ALREADY GRADED
A+

Save




Get a taste for our practice questions


Learn


Studied 7 terms


Nice work, you're crushing it


Continue studying in Learn

,Terms in this set (93)


Nuclear Testing
Basics covered
Speedy Moisture
in Level 1
Report Forms

Earthwork has to Earthwork is the excavation and
do with the placement of soils and materials
roadway in what supporting the proposed roadway.
way?

In Earthwork 6" of compacted depth at full width
what is a lift?

A lot is 1 lift at 500 ft or within
In Earthwork compacted area. Isolated
what is a Lot? compaction operations are separate
lots.

Sampling at the Done for base, sub grade, and
roadway is done embankment.
for

Sampling is generated with random numbers
determined how usually by a Verification Inspector

, What is Minimum of three representative
important about sample combined.
sampling at the
roadway

Laboratory Info Management
What is LIMS?
System

The proctor by inputting energy to expel air and
theory is when water in the soil voids
compaction is
achieved how

Compaction An increase in unit weight, decrease
causes in compressibility and permeability.

The proctor is In a laboratory and establishes a
determined density standard to be used on the
where and roadway
creates what

Material is gathered from the road
Lab proctors are and prepared with different amounts
created how of water then placed in molds and
hammered

What is a It is used in base, sub grade, MSE
modified proctor wall back fill materials
used in
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Darkfury
1.5
(2)

Get to know the seller

Seller avatar
Darkfury Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
5060
Member since
10 months
Number of followers
1
Documents
4393
Last sold
2 days ago

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions