SWM DEQ Exam 2025 Questions and Answers The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ - ANS Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that are - ANS greater than or equal to an acre The Stormwater Management Act requires the State Water Control Board to - ANS permit, regulate, and control stormwater runoff DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts upon request - ANS 90 The Stormwater Management Act requires the following individuals to obtain and maintain a certificate of competency - ANS staff of a stormwater program, anyone contracted by a VSMP authority, standard and specification holders The dual certificate will expire three years from - ANS the latest date of the certificates SWM plan must be approved by ___ before land disturbance - ANS VSMP program authority Pg. 2 Copyright © 2025 Jasonmcconell. ALL RIGHTS RESERVED. The water quality criteria sets a site-based load limit of ____ of total phosphorus for new development - ANS 0.41 lbs/acre/year The phosphorus load limit uses the - ANS 10% impervious cover Part II B and II C water quantity criteria addresses - ANS channel protection and flood protection Which two plans in the SWPPP must be approved? - ANS SWM plan, ESC plan Does the SWM plan address runoff during or after construction? - ANS post-construction What is the lower limit of the range of imperviousness that can result in stream degradation? - ANS 10% What do land disturbing activities consist of? - ANS excavating, clearing, grading LDA threshold for the SWM Act and Regulation - ANS 1 acre or 2500 square feet for Chesapeake Bay Preservation Act In situations where an initial exemption was applicable because LDAs were related to emergency work, VSMP authority shall be advised of the disturbance within - ANS 7 days of commencing the LDA and shall submit a permit application within 30 days of starting the land- disturbing activity Localities with MS4 - ANS must adopt and administer a stormwater program Localities without MS4 - A

Show more Read less
Institution
SWM DEQ
Course
SWM DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
May 22, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SWM DEQ Exam 2025 Questions and
Answers



The Virginia Stormwater Management Program is authorized by the ______ and administered
through the ______ - ANS Virginia Stormwater Management Act, Virginia Stormwater
Management Program Regulation


VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities
that are - ANS greater than or equal to an acre



The Stormwater Management Act requires the State Water Control Board to - ANS permit,
regulate, and control stormwater runoff


DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts upon
request - ANS 90


The Stormwater Management Act requires the following individuals to obtain and maintain a
certificate of competency - ANS staff of a stormwater program, anyone contracted by a
VSMP authority, standard and specification holders



The dual certificate will expire three years from - ANS the latest date of the certificates



SWM plan must be approved by ___ before land disturbance - ANS VSMP program authority




Pg. 1 Copyright © 2025 Jasonmcconell. ALL RIGHTS RESERVED.

, The water quality criteria sets a site-based load limit of ____ of total phosphorus for new
development - ANS 0.41 lbs/acre/year



The phosphorus load limit uses the - ANS 10% impervious cover



Part II B and II C water quantity criteria addresses - ANS channel protection and flood
protection



Which two plans in the SWPPP must be approved? - ANS SWM plan, ESC plan



Does the SWM plan address runoff during or after construction? - ANS post-construction


What is the lower limit of the range of imperviousness that can result in stream degradation? -
ANS 10%



What do land disturbing activities consist of? - ANS excavating, clearing, grading



LDA threshold for the SWM Act and Regulation - ANS 1 acre or 2500 square feet for
Chesapeake Bay Preservation Act


In situations where an initial exemption was applicable because LDAs were related to
emergency work, VSMP authority shall be advised of the disturbance within - ANS 7 days of
commencing the LDA and shall submit a permit application within 30 days of starting the land-
disturbing activity



Localities with MS4 - ANS must adopt and administer a stormwater program



Localities without MS4 - ANS may choose to administer a VSMP or have DEQ administer the
program


Pg. 2 Copyright © 2025 Jasonmcconell. ALL RIGHTS RESERVED.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StarGuide Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
16
Member since
1 year
Number of followers
0
Documents
2591
Last sold
1 week ago
FIRST CLASS GALORE

Accurate Exam Study Materials.Verified And Updated By Professionals.

4.3

4 reviews

5
1
4
3
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions