✔✔An electrical contractor has two branch offices and has utilized a video conferencing
solution that utilizes the telephone system for the voice transmissions and a DSL
Internet connection to transmit and receive the video feed. The company also has a
separate Internet connection that is used by the staff to surf the web and access email.
They are planning to install equipment that will allow them to use a single Internet
connection for the video, voice, and data. - ✔✔Multiplexer
✔✔A company has experienced a great deal of growth in their customer population and
as a result they are renting a new space in their current building to expand their
customer service team. The Network Administrator has installed a device that allows the
LAN network on the new floor to connect with the LAN network on the old floor. -
✔✔Bridge
✔✔About 6 months after the situation described in #5 above the CSO decides that they
need to upgrade their equipment and install a device that is application aware meaning
that it knows the types of applications the company runs and can better detect and
address potentially harmful network traffic reducing the need for a Network
Administrator to manually adjust security rules. - ✔✔Next Generation Firewall
✔✔A medium sized corporation has purchased a competitor, which effectively doubles
the size of their business overnight. After performing an analysis of the previous
competitor's network, they determine that now that they are a larger company they will
upgrade their data center so that they can purchase 10 high powered servers and
relocate the 30 different systems used by the two companies onto the 10 servers. They
will take each of the 10 servers and allocate resources such a hard drive storage, RAM,
and CPUs to 2 or more systems allowing each of the 10 servers to run 2-4 of the
systems. There are a couple of advantages to this approach. First, they did not have to
purchase 30 servers. Second, they will save on the electric that would have been
needed to operate 30 servers. Finally, they can adjust the amount of RAM, CPU speed,
or storage to the various systems depending on the number of users logged in. -
✔✔Hypervisor
✔✔This cloud service involves the Cloud Provider supplying all software and hardware.
It is the Cloud Provider's responsibility to manage, upgrade, and repair all aspects of the
system should it fail. - ✔✔SaaS
✔✔This cloud service involves the Cloud Provider supplying the hardware, Internet
connection, and services such as a database service, but they do not manage all
aspects of the server and you are responsible for managing the system should it run
into issues. - ✔✔PaaS
, ✔✔This cloud service involves the Cloud Provider providing a server with no software
installed and an Internet connection that will allow you to manage the system and install
any software you will need. You are responsible for managing all aspects of the system
except for hardware. If the hardware fails, the Cloud Provider must repair the hardware.
- ✔✔IaaS
✔✔The CEO expresses concerns to the CIO that the Software Development Team has
taken on multiple large-scale projects and wants to assure that the projects can be
completed on-time. Which type of feasibility study would be needed to address this
concern? - ✔✔Schedule Feasibility
✔✔The Plant Manager has been working with the CIO to develop a new system for
tracking defect rates, but there is a shift manager that feels this change will not be good
for his team, so he has come up with many reasons he and his team are unable to
make it to meetings about the project. It remains to be seen if this shift manager's action
can reduce the effectiveness of the system being developed Which type of feasibility
study would be needed to address this concern? - ✔✔Political Feasibility
✔✔The CFO has asked that a project which has just begun the analysis be re-
evaluated in terms of the expected Total Cost of Ownership (TCO). She believes that
the project may exceed its budget. Which type of feasibility study would be needed to
address this concern? - ✔✔Economic or Financial Feasibility
✔✔During a project the Lead Software Developer resigns his position. The Lead
Developer possessed unique expertise that was critical to the integration of the new
system with the organization's ERP system. The CIO is left wondering if this resignation
will prevent the project from completing on-time because the team now lacks leadership
as well as being down a member who possessed unique skills. Which type of feasibility
study would be needed to address this concern? - ✔✔Technical Feasibility
✔✔You have been hired as the CSO and have been asked to engage in a technical
feasibility study to investigate ways of improving authentication systems. The current
authentication method is to utilize a username and password. What type of
authentication does it represent? - ✔✔Knowledge based authentication (i.e., What you
know)
✔✔You have been hired as the CSO and have been asked to engage in a technical
feasibility study to investigate ways of improving authentication systems. Equip all
laptops that allow the built-in camera to be used for facial recognition as a means of
authenticating. What type of authentication does this represent? - ✔✔Identity based
authentication (i.e., Who you are)
✔✔You have been hired as the CSO and have been asked to engage in a technical
feasibility study to investigate ways of improving authentication systems. Authentication