DBIA - Project Delivery Questions and
Answers 100% Correct
Bridging is the passing off or assigning of an architect's partially designed drawings to
another architect or DB Firm. T/F? - ANSWER-True
CM @ Risk project delivery is faster than Design-Bid-Build, but can be slower than
Design-Build. T/F - ANSWER-True
CM-as-Advisor may be added to any project delivery method. T/F? - ANSWER-True
Design - Build delivers equal or higher quality than DBB projects according to a
comparative study by CII and Penn State. T/F? - ANSWER-True
Fast tracking a project and phased construction is possible using the CM @ Risk project
delivery method. t/f? - ANSWER-true
In a GMP contract approach/payment the Owner and DB entity share the costs in
excess of the GMP established by the DB entity. T/F? - ANSWER-False
It is recommended to get a contractor on board early during the business and planning
stage of a DB project to have the best opportunity to achieve all objectives. T/F -
ANSWER-True
Most Public Procurement statutes require the selection of design services be purchased
on the basis of lowest responsible bid? T/F? - ANSWER-False
Project delivery selection influences when contractor gets on board. T/F - ANSWER-
True
The DB delivery method may include additional services such as site acquisition and
financing. T/F? - ANSWER-True
The owner can pre-determine how a project's construction team will interact with him or
her and with each other through the selection of the delivery system. T/F? - ANSWER-
True
The primary goal in choosing a delivery method is to ensure that it will meet the Owner's
project objectives while at the same time allowing the project to be completed on time
and within budget? T/F - ANSWER-True
There are always at least three parties involved in every project delivery process; the
Owner, Architect and Contractor. T/F? - ANSWER-True
Answers 100% Correct
Bridging is the passing off or assigning of an architect's partially designed drawings to
another architect or DB Firm. T/F? - ANSWER-True
CM @ Risk project delivery is faster than Design-Bid-Build, but can be slower than
Design-Build. T/F - ANSWER-True
CM-as-Advisor may be added to any project delivery method. T/F? - ANSWER-True
Design - Build delivers equal or higher quality than DBB projects according to a
comparative study by CII and Penn State. T/F? - ANSWER-True
Fast tracking a project and phased construction is possible using the CM @ Risk project
delivery method. t/f? - ANSWER-true
In a GMP contract approach/payment the Owner and DB entity share the costs in
excess of the GMP established by the DB entity. T/F? - ANSWER-False
It is recommended to get a contractor on board early during the business and planning
stage of a DB project to have the best opportunity to achieve all objectives. T/F -
ANSWER-True
Most Public Procurement statutes require the selection of design services be purchased
on the basis of lowest responsible bid? T/F? - ANSWER-False
Project delivery selection influences when contractor gets on board. T/F - ANSWER-
True
The DB delivery method may include additional services such as site acquisition and
financing. T/F? - ANSWER-True
The owner can pre-determine how a project's construction team will interact with him or
her and with each other through the selection of the delivery system. T/F? - ANSWER-
True
The primary goal in choosing a delivery method is to ensure that it will meet the Owner's
project objectives while at the same time allowing the project to be completed on time
and within budget? T/F - ANSWER-True
There are always at least three parties involved in every project delivery process; the
Owner, Architect and Contractor. T/F? - ANSWER-True