ICC Prestressed Concrete Q & A Module 1. Prestressed concrete is: - Correct Answer - - The tensioning of steel-stranded cables prior to concrete placement - The tensioning of steel-stranded cables after concrete has been placed and hardened - Concrete that has received a tensile load prior to any service loads Module 1. The use of a prestressed concrete system will achieve the following: - Correct Answer - - Reduced thickness of concrete, less conventional reinforcing steel and adequate crack control Module 1. Once tensioned, the tensioning cables are held securely in a tensioned state by: - Correct Answer - Wedges that have been seated Module 1. The end of a cable that terminates within a concrete slab, thus rendering it in accessible from outside the concrete is known as: - Correct Answer - The dead end Module 1. The presence of sheathing on a wire-stranded cable indicates that: - Correct Answer - It will be used in an unbonded system application Module 1. The most common post-tension cable tendons in use today are made up of: - Correct Answer - 7 steel strands of wire wrapped together Module 1. In an unbonded system, the force applied to the concrete after tensioning: - Correct Answer - Comes from the anchorage zone only Module 2. Post-tension manufacturing plants must be certified by: - Correct Answer - PTI Unbonded Plant Certification Program Module 2. Prior to cutting the tendon tails after tensioning, the field records of stressing activities must be forwarded to and approved by: - Correct Answer - The engineer of record Module 2. In the event that a new set of stressing equipment is delivered to the project, this equipment should contain __________ for review prior being used on-site: - Correct Answer - A current calibration chart relating gauge pressure to force applied Module 2. According to the Field Procedures Manual for Unbonded Single Strand Tendons, all of the following items are necessary for post-tension document control except: A) Concrete Strength Results B) Shipping Lists C) Material Certifications D) Approved Installation Drawings - Correct Answer - A) Concrete Strength Results

Show more Read less
Institution
ICC REINFORCED CONCRETE
Course
ICC REINFORCED CONCRETE









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC REINFORCED CONCRETE
Course
ICC REINFORCED CONCRETE

Document information

Uploaded on
May 21, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC Prestressed Concrete Q & A
Module 1. Prestressed concrete is: - Correct Answer - - The tensioning of steel-stranded cables
prior to concrete placement
- The tensioning of steel-stranded cables after concrete has been placed and hardened
- Concrete that has received a tensile load prior to any service loads

Module 1. The use of a prestressed concrete system will achieve the following: - Correct Answer
- - Reduced thickness of concrete, less conventional reinforcing steel and adequate crack
control

Module 1. Once tensioned, the tensioning cables are held securely in a tensioned state by: -
Correct Answer - Wedges that have been seated

Module 1. The end of a cable that terminates within a concrete slab, thus rendering it in
accessible from outside the concrete is known as: - Correct Answer - The dead end

Module 1. The presence of sheathing on a wire-stranded cable indicates that: - Correct Answer
- It will be used in an unbonded system application

Module 1. The most common post-tension cable tendons in use today are made up of: - Correct
Answer - 7 steel strands of wire wrapped together

Module 1. In an unbonded system, the force applied to the concrete after tensioning: - Correct
Answer - Comes from the anchorage zone only

Module 2. Post-tension manufacturing plants must be certified by: - Correct Answer - PTI
Unbonded Plant Certification Program

Module 2. Prior to cutting the tendon tails after tensioning, the field records of stressing activities
must be forwarded to and approved by: - Correct Answer - The engineer of record

Module 2. In the event that a new set of stressing equipment is delivered to the project, this
equipment should contain __________ for review prior being used on-site: - Correct Answer - A
current calibration chart relating gauge pressure to force applied

Module 2. According to the Field Procedures Manual for Unbonded Single Strand Tendons, all
of the following items are necessary for post-tension document control except:
A) Concrete Strength Results
B) Shipping Lists
C) Material Certifications
D) Approved Installation Drawings - Correct Answer - A) Concrete Strength Results

, Module 2. When reporting stressing results, the following information is necessary to record:
A) Jack and gauge serial number
B) Elongation measurements and percentage deviation
C) Both A and B
D) Gauge Manufacturer
E) All three, A, B, and D - Correct Answer - C) Both A and B

Module 2. When moving post-tension cables across the site, the use of _______ is permitted.
A) Nylon slings, with unloading as close as placement as possible
B) Smooth finished chains with limited use
C) Epoxy coated high strength wire with limited use
D) A large front loader exercising caution - Correct Answer - Nylon slings, with unloading as
close to the placement as possible

Module 2. When storing post-tension cables, care must be taken to: - Correct Answer - Prevent
the cables from being exposed to weather elements and moisture

Module 2. During deliver, it is the ______________ responsibility to ensure the delivered items
match the shipping list. - Correct Answer - Buyer's

Module 2. According to the Field Procedures Manual for Unbonded Single Strand Tendons, the
follow documents must be kept on site: - Correct Answer - 1) Approved Installation Drawings
2) Shipping Lists
3) Material Certifications
4) Jack Calibrations
5) Stressing Records

Module 2. Install drawings show: - Correct Answer - Plan views, elevation views, and details so
the subcontractor and inspector can clearly see the tendon layout. This includes tendon profiles,
also known as drape.

Module 2. Drape - Correct Answer - Tendon profiles

Module 2. Material Certifications - Correct Answer - Documents that describe the cables'
physical properties and factory testing results.

Module 2. Stressing records, written by the inspector, should include: - Correct Answer - -
Location of tendons stressed (grid line to grid line)
- Type of tendons stressed (banded, uniform, beans, temperature)
- Gauge/jack used
- Date, time, and weather during stressing
- Stressing crew
- Elongations based on a traceable numbering system
- Any deviations from tolerances
$8.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
gurutech

Get to know the seller

Seller avatar
gurutech Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
7 months
Number of followers
0
Documents
63
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions