A SIPOC diagram displays more process detail than does a process map - Answers False
The "S" in SIPOC represents _________________ . - Answers Suppliers
The purpose of an X-Y matrix is to measure output variability. - Answers False
Which of the following represents the rate at which a finished product needs to be completed in order
to meet customer demand. - Answers Takt Time
If the production time that is available is 420 minutes and the system must process 35 units what is the
Takt time? - Answers 12
The purpose of Kanban, as used by Toyota, was to ________________ . - Answers match inventory with
demand
Kanban is associated with which of the following processing concepts. - Answers pull
Kanban is associated with the traditional Push approach to processing units through a system. - Answers
False
Kanban is related to Just in Time inventory strategies. - Answers True
The word Kanban refers to a ____________ . - Answers Visual Sign
In a Two Bin Kanban process, orders are placed after the second bin is depleted. - Answers False, They
are placed once the first bin is depleted of inventory items
Kanban concepts are limited to manufacturing operations. - Answers False
The difference between the total time it takes to process an order and the time it takes to complete
each of the essential steps in the order is considered non-value added time. - Answers True
The term value-added is related to the cost of delivering products and services to customers. - Answers
False
A Value Stream Map is also referred to as SIPOC diagram - Answers False
A shape similar to a "D" is used to identify process delays. - Answers True
Process steps in a Value Stream Map move from right to left. - Answers False; Left to right
Metrics represent measurable goals necessary to evaluate the progress and outcome of steps in a Lean
or Six Sigma project. - Answers True
The concept of Lean focuses on the efficiency of an entire process. - Answers True
The primary purpose of Lean is to eliminate all value-added steps. - Answers False