Solutions
a body harness system shall be attached to the
personnel platform except which working condition
Correct Answers over water
a crane operator is required to have a physical
every Correct Answers 3 years
a cranes net capacity is equal to Correct Answers
the manufactures load rating less all deductions
a cranes net capacity is the Correct Answers
manufactures load rating minus all deductions
a load applied at an angle to the vertical plane of
the boom is Correct Answers side loading
a mobile crane`s rate capacity, as listed in the load
chart, is either based on either structural limits or
Correct Answers stability
a monthly inspection includes Correct Answers a
comprehensive inspection
a regular lay running rope should be replaced when
it has Correct Answers 3 broken wires or more in
a strand in a lay
, all of the following can cause a two-blocking
condition except Correct Answers raising the
boom
all the cranes involved in a multiple crane lift, shall
Correct Answers be leveled properly
an auxiillary boom head is intended to be used
with Correct Answers a whip line
an example of duty cycle operations would be
Correct Answers handling large volumes of
concrete
as rope spools onto the hoist drum of a crane and
the layers increase, available line pull will Correct
Answers decrease
bold line is used on a capacity chart, the capacities
above the bold line are based on Correct Answers
75% of structural strength
considering the wire rope on a crane, which of the
following is prohibited by OHSA Correct Answers
splicing
cranes with a suspended load generates the
highest ground pressure when working over the
Correct Answers corner