CSLB CONCRETE C8 LICENSE PRACTICE TEST 4| QUESTIONS AND CORRECT ANSWERS WITH EXPLANATIONS | GRADED A+ | VERIFIED ANSWERS | LATEST VERSION

Rating
-
Sold
-
Pages
19
Grade
A+
Uploaded on
16-05-2025
Written in
2024/2025

CSLB CONCRETE C8 LICENSE PRACTICE TEST 4| QUESTIONS AND CORRECT ANSWERS WITH EXPLANATIONS | GRADED A+ | VERIFIED ANSWERS | LATEST VERSION

Institution
CSLB CONCRETE C8 LICENSE PRACTICE
Course
CSLB CONCRETE C8 LICENSE PRACTICE










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CSLB CONCRETE C8 LICENSE PRACTICE
Course
CSLB CONCRETE C8 LICENSE PRACTICE

Document information

Uploaded on
May 16, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1



CSLB CONCRETE C8 LICENSE PRACTICE TEST 4|
QUESTIONS AND CORRECT ANSWERS WITH
EXPLANATIONS | GRADED A+ | VERIFIED ANSWERS |
LATEST VERSION
Which of the following tools is sufficient for the compacting of concrete in a small
project? - (ANSWER)Hand tamper



At 50°F, how long should the concrete be protected to attain sufficient strength
(normally 500 Psi)? - (ANSWER)48 Hours



Which of the following arrangements can be used to keep the concrete at the
recommended 50°F temperature for allowing proper setting? - (ANSWER)Heaters
OR Thermal blankets



What is the 'Swell Factor' for sandy loam soil when performing excavation work
for a concrete structure? - (ANSWER)About 1.1 to 1.2



Which of the following building specification and cost estimating standard
systems is accepted as ASTM standard? - (ANSWER)UniFormat System



Which of the following factors directly impact each other in the process of cost
estimation for a concrete building project? - (ANSWER)Interest rate, Holding cost,
Cost escalation

, 2


Which of the following points are true about Work Breakdown Structure (WBS) in
the planning of a construction project? - (ANSWER)Decomposing of a task into
doable, measureable, estimable , and schedulable units



Which of the following statements is correct about the finishing of a concrete? -
(ANSWER)Concrete should be finished once bleed water and surface sheen
disappear



An excavation of 10 cubic meters is done on any soil. Which of the following
statements is true about the refilling volume of that excavation with the same
type of soil material? - (ANSWER)More than 10 cubic meters



What type of release oil is commonly used for the construction of wooden forms
in the concrete industry? - (ANSWER)Paraffin base oil



Initial and final setting time values of concrete are normally considered from: -
(ANSWER)Mixing of water into cement material



Form-exposed corners and edges are commonly beveled to avoid any chipping by
using: - (ANSWER)Chamfer strips



Which of the following are the basic crafts used in estimating the concrete
construction cost in the industry? - (ANSWER)Ironworker, Carpenter, Teamster,
Cement mason

, 3


Which of the results of a concrete slump test has the highest workability? -
(ANSWER)True Slump



Explanation:

Workability is the ease or difficulty of placing concrete in a particular location. For
example, a stiff but plastic mix with large aggregate would be workable in large
open form but not in a wall with closely spaced reinforcement. Please note that
the slump test is NOT a measure of workability, and it should not be used to
compare mixes of entirely different proportions or containing different kinds of
aggregate.



What is the maximum depth of a foundation footing commonly used in concrete
construction? - (ANSWER)78"



Which of the following factors should be estimated as earthwork components in
project planning? - (ANSWER)ALL OF THESE



-Rough grading, Excavation, Soil backfilling



-Soil compacting, Fill material compacting, Excavation



-Excavated soil hauling, Soil backfilling, Rough grading

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Steam Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
6127
Member since
10 months
Number of followers
2
Documents
3095
Last sold
2 weeks ago

5.0

500 reviews

5
491
4
8
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions