100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

DEQ- Stormwater Mangement Inspector Exam Questions And Answers 100% Pass

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
15-05-2025
Written in
2024/2025

DEQ- Stormwater Mangement Inspector Exam Questions And Answers 100% Pass What two plans in the SWPPP must be approved? - ANS Erosion and sediment control plans and stormwater management plans must be approved. Does the stormwater management plan address runoff during construction or after? - ANS The stormwater management plan addresses post-construction stormwater runoff. What impact does impervious cover have on water quality? - ANS The volume and velocity of stormwater runoff increases as natural vegetation is replaced with roads, buildings, parking areas and other impervious surfaces. The increase in stormwater runoff leads to an increase in pollutants, such as sediment and phosphorus that are carried to waterways, which has a negative effect on water quality. What is the target pollutant in the water quality criteria ? - ANS Phosphorus What is the lower limit of the range of imperviousness that scan result in stream degradation? - ANS 10% The SWM regulation ensures water quantity is considered in stormwater management planning to protect against which two destructive forces? - ANS Channel erosion and flooding. ©EVERLY 2025 ALL RIGHTS RESERVED Discuss how the rate of runoff changes after development. - ANS The rate of runoff increase after development because of the replacement of vegetation with impervious surfaces. A larger volume of water will travel more quickly through a stream channel, potentially causing erosion and flooding. A locality VSMP must be at least as stringent as what state permit? - ANS Construction GP (9VAC). What plans must a locality's ordinance require to be submitted and approved? - ANS ESC plan and SWM plan (9VAC) List three violations for which a penalty may be imposed. - ANS (9VAC) *No registration date *No SWPPP *Incomplete SWPPP *SWPPP not available for review *No approves ESC plan *Failure to install stormwater management BMPs or ESCs *Stormwater BMP or erosion and sediment controls improperly installed or maintained *Operational deficiencies

Show more Read less
Institution
DEQ- Stormwater Mangement Inspector
Course
DEQ- Stormwater Mangement Inspector









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DEQ- Stormwater Mangement Inspector
Course
DEQ- Stormwater Mangement Inspector

Document information

Uploaded on
May 15, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©EVERLY 2025 ALL RIGHTS RESERVED




DEQ- Stormwater Mangement Inspector
Exam Questions And Answers 100% Pass




What two plans in the SWPPP must be approved? - ANS Erosion and sediment control plans
and stormwater management plans must be approved.


Does the stormwater management plan address runoff during construction or after? -
ANS The stormwater management plan addresses post-construction stormwater runoff.



What impact does impervious cover have on water quality? - ANS The volume and velocity of
stormwater runoff increases as natural vegetation is replaced with roads, buildings, parking
areas and other impervious surfaces. The increase in stormwater runoff leads to an increase in
pollutants, such as sediment and phosphorus that are carried to waterways, which has a
negative effect on water quality.



What is the target pollutant in the water quality criteria ? - ANS Phosphorus


What is the lower limit of the range of imperviousness that scan result in stream degradation? -
ANS 10%


The SWM regulation ensures water quantity is considered in stormwater management planning
to protect against which two destructive forces? - ANS Channel erosion and flooding.

, ©EVERLY 2025 ALL RIGHTS RESERVED


Discuss how the rate of runoff changes after development. - ANS The rate of runoff increase
after development because of the replacement of vegetation with impervious surfaces. A larger
volume of water will travel more quickly through a stream channel, potentially causing erosion
and flooding.



A locality VSMP must be at least as stringent as what state permit? - ANS Construction GP
(9VAC25-870-106).



What plans must a locality's ordinance require to be submitted and approved? - ANS ESC
plan and SWM plan (9VAC25-870-148)



List three violations for which a penalty may be imposed. - ANS (9VAC25-870-116)
*No registration date


*No SWPPP


*Incomplete SWPPP


*SWPPP not available for review


*No approves ESC plan


*Failure to install stormwater management BMPs or ESCs


*Stormwater BMP or erosion and sediment controls improperly installed or maintained


*Operational deficiencies

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Everly Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
18
Member since
1 year
Number of followers
1
Documents
2796
Last sold
2 months ago
Study packs.

Find Quality Exam Materials made by professionals With A guaranteed A+

4.3

4 reviews

5
2
4
1
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions