ARCH 113 STUDY SESSION
INTERNATIONAL ZONING CODE EXAM
QUESTIONS AND ANSWERS
The building permit, or a copy of the permit, shall be kept ______________ until
completion of the project. - ANSWER-a. At the job site
When a building permit is issued, the construction documents shall be approved as
______________ . - ANSWER-D. Reviewed for code compliance
Unless otherwise mandated by state or local laws, the approved construction
documents shall be retained by the building official for a minimum of ______________
from the date of completion of the permitted work. - ANSWER-B. 180 days
Which one of the following inspections is not specifically identified by the International
Building Code as a required inspection, where applicable? - ANSWER-C. soil
classification inspection
In addition to their authorized agent, whose duty is it to notify the building official that the
work is ready for inspection? - ANSWER-A. The permit holder
The certificate of occupancy shall contain all of the following information except: -
ANSWER-D. The building's allowable height and area
A temporary certificate of occupancy is valid for what maximum period of time? -
ANSWER-D. A period set by the building official
The board of appeals is not authorized to rule on an appeal based on a claim that
_______________. - ANSWER-B. A code
A one-family dwelling's accessory structure is regulated by the International Residential
Code provided it is a maximum of __________ story (stories) in height above grade
plane. - ANSWER-C. 3
The provisions of __________ shall apply to the repair, alteration, change of
occupancy, addition to and relocation of existing buildings. - ANSWER-C. International
Existing Building Code
Where a conflict occurs between provisions in the International Building Code and those
in a referenced standard, which provision(s) shall apply? - ANSWER-A. International
Building Code
INTERNATIONAL ZONING CODE EXAM
QUESTIONS AND ANSWERS
The building permit, or a copy of the permit, shall be kept ______________ until
completion of the project. - ANSWER-a. At the job site
When a building permit is issued, the construction documents shall be approved as
______________ . - ANSWER-D. Reviewed for code compliance
Unless otherwise mandated by state or local laws, the approved construction
documents shall be retained by the building official for a minimum of ______________
from the date of completion of the permitted work. - ANSWER-B. 180 days
Which one of the following inspections is not specifically identified by the International
Building Code as a required inspection, where applicable? - ANSWER-C. soil
classification inspection
In addition to their authorized agent, whose duty is it to notify the building official that the
work is ready for inspection? - ANSWER-A. The permit holder
The certificate of occupancy shall contain all of the following information except: -
ANSWER-D. The building's allowable height and area
A temporary certificate of occupancy is valid for what maximum period of time? -
ANSWER-D. A period set by the building official
The board of appeals is not authorized to rule on an appeal based on a claim that
_______________. - ANSWER-B. A code
A one-family dwelling's accessory structure is regulated by the International Residential
Code provided it is a maximum of __________ story (stories) in height above grade
plane. - ANSWER-C. 3
The provisions of __________ shall apply to the repair, alteration, change of
occupancy, addition to and relocation of existing buildings. - ANSWER-C. International
Existing Building Code
Where a conflict occurs between provisions in the International Building Code and those
in a referenced standard, which provision(s) shall apply? - ANSWER-A. International
Building Code