Chapter 4 Questions And Answers
object A(n) h________ hline his ha hthick hline hused hto hdefine hand hprovide hdetail habout ha hparticular hshape
hor hsymbol.
change horder A h_________ his ha hdocument hthat his hused hto hinitiate hand hkeep htrack hof hchanges hto hthe
horiginal hwork.
wireway A h_______ his ha hsheet-metal hor hnonmetallic henclosure hwith ha hcover hthat hopens hto
hprovide haccess hto hthe hconductors.
power With ha(n) h______ hpanelboard, h10% hor hless hof hthe hinstalled hovercurrent hdevices hsupply hlighting
hand happliances hbranch hcircuits.
24" hx h36" The hmost hcommon hsize hfor ha hworking hdrawings his h________.
detail A(n) h________ hdrawing his hused hto hprovide hinformation hnot hclearly hshown hin hanother hpart hof
hthe hdrawing.
4, h0 A hplan hview hlooks hdown hat ha hbuilding hfrom happroximately h______-_______ habove hthe hfloor.
Construction hspecifications hInstitute h(CSI) The h_________ his ha hnonprofit horganization hthat
hprovides hstandardized hspecifications hfor hbuilding hconstruction.
panelboard A h_______ his han helectrical hpanel, hor hgroup hof hpanels hdesigned hto hform ha hsingle hpanel,
hthat his hcontained hin ha hcabinet hor hcutout hbox.
exposed Thick hbroken hlines hare hused hto hindicate hwiring hthat his_______.
guy A h_______ his ha hrope, hwire, hor hcable hused hto hstabilize ha hvertical hmember.
drawing A(n) h__________ hnote his ha hnote hon ha hdrawing hthat hcontains hinformation hspecific hto
hthe hdrawing hon hthat hparticular hpage hor hsheet.
leader A h_______ hline his han hinclined hline hon ha hdrawing hor hprint hthat hextends hfrom ha hwritten hnote hto
hthe hobject hthat hit hrefers hto.
as-built A(n) h______ hdrawing his ha hfinal hdrawing hprepared hby han hAE hfirm hand hturned hover hto hthe
hbuilding howner hat hthe hconclusion hof hthe hproject hto haccurately hreflect hthe hcompleted hproject.
convenience A(n) h________ houtlet his ha hreceptacle houtlet hthat his hinstalled hfor hgeneral-purpose huse.
AE hfirm The hfacility howner hhires ha(n) h______- hthrough ha hcontract hprocess hto haccomplish hthe hbuilding
hdesign.