100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

WMGT 101-22A EXAM 3 WITH 100- CORRECT ANSWERS

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
04-05-2025
Written in
2024/2025

WMGT 101-22A EXAM 3 WITH 100% CORRECT ANSWERS AFI 10-245, Antiterrorism - CORRECT ANSWERCE shall: have at least 1 engineer at each base must complete Security Eng AT Planning & Design Course, review, document, and track construction projects AT compliance, provide vulnerability assessment protection option program (VAPO) analysis for all critical facilities and off-base leases, and work with the Base Antiterrorism Officer

Show more Read less
Institution
WMGT 101-22A
Course
WMGT 101-22A









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WMGT 101-22A
Course
WMGT 101-22A

Document information

Uploaded on
May 4, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

WMGT 101-22A EXAM 3 WITH 100% CORRECT ANSWERS
AFI 10-245, Antiterrorism - CORRECT ANSWER✅✅✅CE shall: have at least 1 engineer at each base
must complete Security Eng AT Planning & Design Course, review, document, and track construction
projects AT compliance, provide vulnerability assessment protection option program (VAPO) analysis for
all critical facilities and off-base leases, and work with the Base Antiterrorism Officer



Antiterrorism Requirement Planning - CORRECT ANSWER✅✅✅1. UFC 4-020-01

2. Is only the minimum standard required?

3. Yes: construction standoff distance available?

No: UFC 4-020-02 and support manuals

4. If standoff distance is available, apply UFC 4-010-01 and support manuals



Design Basis Threat (DBT) - CORRECT ANSWER✅✅✅Baseline threat used in the design of protective
measures



Initial DBT - CORRECT ANSWER✅✅✅Based on planning team, local intel and Geographic Combatant
Command (COCOM) Theater-Wide threat assessments



Modify Initial DBT - CORRECT ANSWER✅✅✅Local threat assessments



Level of Protection - CORRECT ANSWER✅✅✅The degree to which an asset is protected, defines the
amount of damage a facility or asset can sustain during an attack



LOP: Very low - CORRECT ANSWER✅✅✅Progressive collapse is unlikely, but space in and around
damaged area will be unusable and onset of structural collapse occurs. Glazing is likely to be propelled
into the building and cause serious injuries. Doors may be propelled into rooms, presenting serious
hazards.



LOP: Low - CORRECT ANSWER✅✅✅Building will not be economically repairable and space in and
around damaged area will not be usable, but progressive collapse will not occur. Glazing will fracture
and may come out of the frame, but does not present a significant injury hazard. Doors may fail but
present minimal hazards.

, LOP: Medium - CORRECT ANSWER✅✅✅Minor damage, space in and around damaged area can be
used and will be fully functional after cleanup and repairs. Glazing will fracture but remain in the frame.
Doors may stay in frames but will not be reusable.



LOP: High - CORRECT ANSWER✅✅✅Minimal to no damage with no permanent definitions. Glazing
will not break. Doors will be reusable.



UFC 4-010-01 - CORRECT ANSWER✅✅✅DoD minimum antiterrorism standards for buildings. Intent
is to reduce mass casualties, minimize collateral damage to nearby facilities, and facilitate future
upgrades and increases FPCON.



UFC 4-020-01 - CORRECT ANSWER✅✅✅DoD Security Engineering Facility Planning Manual. Acts as a
starting point for Garrison Antiterrorism and a quantitative risk-based model. Uses scoring model to
evaluate asset value (0-1.0), threat likelihood (0-1.0), and use of minimum AT standards (<0.5). Includes
cost data and helps establish a DBT and required LOP.



AT/FP misconceptions - CORRECT ANSWER✅✅✅1. Bollards, fences, curbs, and barriers are and
adequate substitution for standoff

2. Existing roads must be moved away from existing buildings

3. All building require standoff



Mandatory design standards - CORRECT ANSWER✅✅✅Standard 1: Standoff distance

Standard 6: Progressive collapse

Standard 10: Glazing

Standard 16: Air Intakes



Minimum standoff distance - CORRECT ANSWER✅✅✅Smallest permissible standoff distance for
new and existing construction, regardless of analysis or hardening of the building. Not used for master
planning or programming.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
51
Member since
1 year
Number of followers
1
Documents
10172
Last sold
5 days ago
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3.4

11 reviews

5
4
4
1
3
3
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions