A PLC operates by continuously examining the conditions of its input
terminals, making decisions based on the ladder logic program, and then
updating the condition of its __________ terminals.
output
The term field devices refers to:
All devices that are physically wired to the PLC.
What is the term used for the type of input a thermocouple would
provide?
analog
The __________ software is used to compile and download a project to
an S7-1200 processor.
TIA Portal
What is the term used for the type of input a pushbutton would provide.
digital
The two basic types of input instructions used by the S7-1200 are the
__________ instruction, and the Normally Closed Contact instructions.
Normally Open Contact (N.O.)
, __________ are often used to examine input and output status for
troubleshooting field devices, program logic, or the PLC.
Watch tables
The five numbering systems commonly used by PLCs are: __________,
decimal, binary, octal, and binary coded decimal.
hexadecimal
If the status indicator for a Function or Organization Block is indicated as
a "Green Circle".
The online and offline version of the object are identical.
One of the advantages of a PLC is that it permits many instructions to be
controlled by one __________ and it doesn't matter how many of these
are Normally Open Contact or Normally Closed Contact instructions.
input
The_______ Memory stores user programs as they are downloaded to
the processor.
Load
Which of the following is the plc model can be used on the largest
application.
S700 300/400
An S7 __________ is a collection of all of the data and programs
needed to control a machine or process.
project
Correctly Answered and Graded A+ | Latest
2025/2026 Guide
A PLC operates by continuously examining the conditions of its input
terminals, making decisions based on the ladder logic program, and then
updating the condition of its __________ terminals.
output
The term field devices refers to:
All devices that are physically wired to the PLC.
What is the term used for the type of input a thermocouple would
provide?
analog
The __________ software is used to compile and download a project to
an S7-1200 processor.
TIA Portal
What is the term used for the type of input a pushbutton would provide.
digital
The two basic types of input instructions used by the S7-1200 are the
__________ instruction, and the Normally Closed Contact instructions.
Normally Open Contact (N.O.)
, __________ are often used to examine input and output status for
troubleshooting field devices, program logic, or the PLC.
Watch tables
The five numbering systems commonly used by PLCs are: __________,
decimal, binary, octal, and binary coded decimal.
hexadecimal
If the status indicator for a Function or Organization Block is indicated as
a "Green Circle".
The online and offline version of the object are identical.
One of the advantages of a PLC is that it permits many instructions to be
controlled by one __________ and it doesn't matter how many of these
are Normally Open Contact or Normally Closed Contact instructions.
input
The_______ Memory stores user programs as they are downloaded to
the processor.
Load
Which of the following is the plc model can be used on the largest
application.
S700 300/400
An S7 __________ is a collection of all of the data and programs
needed to control a machine or process.
project