What element is targeted by water quality criteria? - ANSWER Phosphorous, it indicates pollution by bonding with other pollutants. At what % impervious cover are streams substantially affected? - ANSWER 25% what is the site-based load limit for water quality? - ANSWER 0.41 lbs/acre/yr total phosphorous

Show more Read less
Institution
VA Deq Swm Inspector
Course
VA deq swm inspector









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VA deq swm inspector
Course
VA deq swm inspector

Document information

Uploaded on
May 2, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • va deq swm inspector
  • va deq swm

Content preview

VA DEQ SWM INSPECTOR EXAM
CORRECT QUESTIONS & ANSWERS||
2025 LATEST UPDATE!!
What element is targeted by water quality criteria? - ANSWER Phosphorous, it indicates
pollution by bonding with other pollutants.

At what % impervious cover are streams substantially affected? - ANSWER 25%

what is the site-based load limit for water quality? - ANSWER 0.41 lbs/acre/yr total
phosphorous

Virginia Runoff Reduction Method- method of load calculations - ANSWER load
calculations based on land cover type and soil type.

what must happen to potentially harmful sheet flow runoff? - ANSWER Must be diverted
to stormwater conveyance system.

SWM ponds must be able to convey water safely up to what level storm event? -
ANSWER must be able to safely convey up to a 100 yr storm.

Define LDA - ANSWER Land disturbing activity; any man-made change to the land
surface that potentially changes its runoff characteristics; includes clearing, grading, and
excavation.

What size LDA must comply with stormwater management regulation? in CPBA areas?
- ANSWER anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more
stringent locally.

what are some activities exempt from SWM regulations? - ANSWER mining, agriculture,
sewer discharges, local reclamation programs, routine maintenance of preexisting
operations, public emergency activity

what term basically means a plea deal for stormwater offenders? - ANSWER consent
order, which replaces penalties with fines.

how long does VSMP authority have to review SWM plan? - ANSWER 15 days to
review and determine approval, and notify applicant.

How often must a VSMP authority inspect an LDA? - ANSWER Periodically.

all SWPPP requirements may be met by - ANSWER incorporating other plans into
reference, or by developing missing elements.

, What must the DEQ issue to an operator before an LDA? - ANSWER a construction GP

How soon after final grade of a site must vegetation be put in place? - ANSWER within
7 days.

How many days does DEQ have to complete review of real or potential inter-
jurisdicitonal impacts upon request? - ANSWER 90 days

Who is required to maintain a certificate of competency by the Stormwater Management
Act? - ANSWER staff of a stormwater program, anyone contracted by a VSMP
authority, and all standard and specification holders

A SWM Plan must be approved by who prior to land disturbance? - ANSWER the
VSMP Program Authority

What is the TP limit for a site? - ANSWER 0.41 lbs/ac/yr

The phosphorus load limit uses what % impervious cover? - ANSWER 10%

Part II B and II C water quantity criteria addresses: - ANSWER channel protection and
flood protection

Of all the plans included in the SWPPP, which two must be approved? - ANSWER the
SWM and ESC Plans

Does a SWM plan address runoff during or after construction? - ANSWER post-
construction

What is the lower limit of imperviousness which could result in stream degradation? -
ANSWER 10%

If land disturbance occurs as a result of emergency work, what is the timeline for
advising the VSMP authority of the disturbance? - ANSWER within 7 days of
commencing the LDA and a permit application must be submitted within 30 days

DEQ is responsible for enforcing the ______ while locality _______ are responsible for
enforcing local ordinances. - ANSWER Construction GP, VSMP

BMPs use these three mechanisms to control pollution: - ANSWER Infiltration, settling,
and vegetative uptake

How long does a locality VSMP authority have to determine the completeness of a
SWM plan? - ANSWER 15 days

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shantelleG West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
609
Member since
2 year
Number of followers
368
Documents
17845
Last sold
9 hours ago
GOLD PREMIUM

HELLO? welcome to my store thanks for visiting this page here you are guaranteed of well revised and assured EXAMS ALL GRADED A+ thus making your education journey easy and seamless . DO NOT HESITATE TO CONTACT ME IF YOU ARE IN NEED OF ANY EXAM .I AM READY 24/7 TO ASSIST YOU ALSO REFER YOUR FRIENDS.

4.1

115 reviews

5
69
4
10
3
22
2
2
1
12

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions