100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BICSI RTPM QUESTIONS WITH COMPLETE ANSWERS

Rating
-
Sold
-
Pages
94
Grade
A+
Uploaded on
22-04-2025
Written in
2024/2025

BICSI RTPM QUESTIONS WITH COMPLETE ANSWERS

Course
RTPM











Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
April 22, 2025
Number of pages
94
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

Analogus Estimates


Give this one a try later!


Based on similar work done in the past

,Performance SoW


Give this one a try later!


Contractor proposes how objectives completed




Scope Management


Give this one a try later!


Development of a scope statement, approved by client and compay
Scope statement defines type/ amount/ limits of the work to be performed
Scope is the fence around the project




Liability


Give this one a try later!


Events or circumstances that affect the succes of the project




Construction Specifications use standard to jointly produce CSI and CSC and have three
parts


Give this one a try later!

, General
Products
Execution




Commissioning Process Documents


Give this one a try later!


• Commissioning plan.
• Reporting forms.
• Schedules and time lines.
• Meeting minutes and progress reporting.
• Conflict and resolution records.
• Startup and testing plans and schedule.
• Training program.




Design Phases


Give this one a try later!


Schematic Design
Design Development
Construction Document




Project Drawing starts with A


Give this one a try later!

, Architectural




Phases of a Project


Give this one a try later!


Design
Bidding
Construction
Post-Construction




Client Satisfaction Quality


Give this one a try later!


A measure of the client's perception of the proccess and benefits received
from survey




Kickoff Meeting


Give this one a try later!


GC will typically conduct a meeting used to initiate the start of the project;
typically attended by all the key stakeholders and contractors; can be done
when Initiating or Planning is complete depending upon the organization

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CLASSROOMTEST Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
33
Member since
11 months
Number of followers
0
Documents
6187
Last sold
1 month ago

3.4

7 reviews

5
3
4
1
3
1
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions