100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Summary

Summary Nearly Free: Budget Analysis and Cost Estimating Capella University MBA-FPX 53333 1 Conte

Rating
-
Sold
-
Pages
27
Uploaded on
20-04-2025
Written in
2024/2025

Nearly Free: Budget Analysis and Cost Estimating Capella University MBA-FPX 53333 1 Contents Budget Analysis Report...............................................................................................................3 Current Financial State............................................................................................................... 3 Cost Estimation Techniques.......................................................................................................5 Cost Estimate of Individual Activities or Work Packages.......................................................8 Failure Points................................................................................................................................ 8 Appendix..................................................................................................................................... 13 2

Show more Read less










Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
April 20, 2025
Number of pages
27
Written in
2024/2025
Type
Summary

Subjects

Content preview

Nearly Free: Budget Analysis and Cost Estimating


Capella University

MBA-FPX 53333




1

,Contents
Budget Analysis Report...............................................................................................................3

Current Financial State............................................................................................................... 3

Cost Estimation Techniques.......................................................................................................5

Cost Estimate of Individual Activities or Work Packages.......................................................8

Failure Points................................................................................................................................ 8

Appendix..................................................................................................................................... 13




2

, Nearly Free.com: Budget Analysis and Cost Estimating

Budget Analysis Report

Project Revive has been contracted to consult and provide analysis and turnaround
proposal for a recently failed project by NearlyFree.com. The NearlyFree.com project was
originally scoped to develop and deploy an automated web-based training system for new
employee orientations to reduce the workload and cut down personnel resources required to
complete the new employee orientation (NEO) training. The web-based module must be
integrated within the company Intranet and provide electronic presentation of all existing human
resources processes, contain online help for assistance during the new hire process, and
contain at least one quiz to assess employee understanding. The training also must incorporate
electronic sign-off upon completion and documentation and tracking of training and feedback to
the human resources department.

Project Revive will provide a detailed financial analysis of the failed project and provide a
project estimation report for the turnaround project. The financial analysis will include a review
of the project’s current financial state, review and analysis of the cost estimating techniques and
work breakdown structure, and a summary of the project’s failure points. The turnaround
proposal and project estimation report will include the Total Cost of Ownership (TCO), Return
on Investment (ROI), the detailed project budget proposal, contingency and management
reserves, and summary of cost estimating techniques used for the proposal.

Current Financial State

The initial budget for the NearlyFree Employee Orientation project was $25,000. The
project cost baseline was estimated at $22,300 with an estimated project duration of 92 days.
The project was suspended on 12/7/24 due to significant cost and schedule overruns that
threatened the success of the project. At that point in the project, the actual cost of the work
completed was $20,453.95 (82% of the total budget), with less than half of the project work
completed (46%). An analysis of the following reports has been completed to further evaluate
the project performance and determine the failure points of the project:

 Project Cost Overview Report
 Earned Value Report
 Variance
 Performance Index

Project Cost Overview

The project cost overview report, included as Figure 1, shows the overall financial status of
the Nearly Free project. The total project cost is estimated at $30,380, which includes the cost
of actual work completed and estimated cost of the remaining work. The project is currently on
track to exceed the $25.000 budget by $8,080, which is 21% of the project budget.

Earned Value Management

Earned value management is a technique used to measure project performance and assess
progress during project execution. EVM measures project performance against the project
estimated baselines to provide objective data, increase accountability, encourage proactivity to


3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
helperatsof1 Wgu
View profile
Follow You need to be logged in order to follow users or courses
Sold
2523
Member since
5 year
Number of followers
2045
Documents
7896
Last sold
1 week ago
Best class tutorials

Well written guides to enhance your learning potential

4.0

439 reviews

5
224
4
88
3
56
2
30
1
41

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions