100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Walmart SWPPP Exam Questions And Answers |Latest 2025 | Guaranteed Pass

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
17-04-2025
Written in
2024/2025

Walmart SWPPP Exam Questions And Answers |Latest 2025 | Guaranteed Pass

Institution
Walmart SWPPP
Course
Walmart SWPPP









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Walmart SWPPP
Course
Walmart SWPPP

Document information

Uploaded on
April 17, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1



Walmart SWPPP Exam Questions And Answers
|Latest 2025 | Guaranteed Pass
The Clean Water Act - (answers)The 1970s federal law that set into place the
regulation of stormwater.



NPDES - (answers)Requirements for managing storm water activity on a
construction site.



The Notice of Termination (NOT) can be filed when - (answers)All construction
activity (inside and outside) is complete and permanent stabilization has been
verified as adequate to meet permit requirements.



All of the following must occur before construction starts, except:

1. Prepare the SWPPP

2. Determine the Operator(s)

3. Submit the Notice of Intent (NOI)

4. Submit the Notice of Termination (NOT) - (answers)4. Submit the Notice of
Termination (NOT).



Which of the following is NOT a beneficial use of water?

1. Swimming

2. Drinking

3. Flushing a spill down a storm drain

, 2


4. Industrial and agricultural water supply - (answers)3. Flushing a spill down a
storm drain.



When installing and maintaining a check dam, make sure:

1. Stormwater is directed around the check dam

2. Void spaces are filled with sediment

3. The low point (overflow) of the check dam is in the middle of the channel

4. The high point of the check dam is in the middle of the channel - (answers)3.
The low point (overflow) of the check dam is in the middle of the channel.



To reduce the possibility of undercutting in channels, you should:

1. Stabilize diversions and swales within 21-days of construction

2. Add mulch and straw

3. Install filter fabric under rock and similar materials placed within the
stormwater conveyance

4. Never install a BMP in a stormwater conveyance - (answers)3. Install filter
fabric under rock and similar materials placed within the stormwater conveyance.



The Good Housekeeping section of the SWPPP must include all BUT which of the
following:

1. Hazardous Waste Management and Disposal Procedures

2. Solid Waste Management and Disposal Procedures

3. Sanitary Waste Management and Disposal Procedures

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DocBeast Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
8352
Member since
10 months
Number of followers
3
Documents
2784
Last sold
5 days ago

5.0

617 reviews

5
600
4
15
3
1
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions